Skip to main content

Moscow road and tunnel tendering

The tender process is opening for a tunnel section as well as linking roads for a project in Moscow. The project will form part of the Stolbovo transport hub. The tunnel will measure 1,.47km long, while the project includes building 7km of roads in Moscow’s Troitsky and Novomoskovsky Administrative Districts (TNAD) in the south west of the city. Also included in the work will be a 2670km overpass section as well as utilities and the construction phase has to be completed within a 17 month period.
June 11, 2018 Read time: 1 min

The tender process is opening for a tunnel section as well as linking roads for a project in Moscow. The project will form part of the Stolbovo transport hub. The tunnel will measure 1,.47km long, while the project includes building 7km of roads in Moscow’s Troitsky and Novomoskovsky Administrative Districts (TNAD) in the south west of the city. Also included in the work will be a 2670km overpass section as well as utilities and the construction phase has to be completed within a 17 month period.

Related Content

  • Sydney’s new tunnel link opening
    July 10, 2020
    Sydney’s new tunnel link is now opening to traffic.
  • Turkey is investing in new motorway and bridge projects
    May 29, 2013
    Turkey is benefiting from new motorway and bridge projects constructed along the BOT model - Gülay Malkoç. Looking at Turkey’s economic development, road construction plays a crucial role. The investment in Turkey is becoming increasingly attractive for both local and foreign investors. There are significant huge road investments and projects being made in Turkey at present, compared with EU countries where the roads need mostly repair and maintenance. According to the approach of Turkey’s Ministry of Trans
  • Colombia road and tunnel connection to Medellin Airport
    September 13, 2017
    Work is well underway on a new road and tunnel project, which will provide an improved connection between the Colombian city of Medellin and its airport. The new link will measure 24km long in all and the construction work is expected to cost over US$342 million, with completion due at the end of 2018. The project is known overall as the Oriente Tunnel, with the work being carried out as a concession by Concesion Tunel Aburrá-Oriente. The project comprises four sections in all. These are the 786m Seminario
  • New projects are planned to improve road links in and around Moscow
    March 11, 2015
    A series of separate works will help improve traffic flow in and around Russia’s capital, Moscow. Construction work has commenced on three tunnels as well as an overpass, with this activity forming part of the planned improvement of the Kaluzhskoe Highway. The work is being carried out by contractor Arks. The work involves widening the highway so that it will feature, and in some places five, lanes in either direction. The contractor is also constructing emergency lanes, 28 km of storm drains and improving