Skip to main content

Moscow overpass rebuild key to urban routes

Contractor Mostotrest has finished work on its US$114 million (€88.5 million) project to rebuild the Krestovsky overpasses over the Moscow and Oktyabrskaya railways at Prospect Mira, Moscow. The link is a vital one for Russian’s capital as it is one of the key urban routes linking the Yaroslavskoye Highway with the centre of Moscow. The company started work on the project in 2007 on the decision of the Moscow authorities for CJSC Administration of Capital Development, Utilities, Buildings and Roads (UKSIK
May 14, 2012 Read time: 2 mins
Contractor 2450 Mostotrest has finished work on its US$114 million (€88.5 million) project to rebuild the Krestovsky overpasses over the Moscow and Oktyabrskaya railways at Prospect Mira, Moscow.

The link is a vital one for Russian’s capital as it is one of the key urban routes linking the Yaroslavskoye Highway with the centre of Moscow.

The company started work on the project in 2007 on the decision of the Moscow authorities for CJSC Administration of Capital Development, Utilities, Buildings and Roads (UKSIKSID), the technical customer of the facility. The rebuilding work was handled by Mostotrest’s branch Mostootryad-4, with OJSC Hyprotransmost carrying out the design work.

The work was needed as the original Krestovsky overpasses were built in 1937 and were unable to cope with current (and predicted) traffic volumes.

The work involved combining the two Bolshoy and Maly Krestovsky overpasses into a single 361m long, steel-reinforced concrete span while the roadway was widened to ten lanes.

Despite the proximity of the overpasses to urban road and rail links, the company was able to allow road and rail traffic to continues at normal levels while work was carried out.

The project was complex and during the first stage, Mostootryad-4’s expert team disassembled the spans and slant legs of the original Bolshoy and Maliy Krestovsky overpasses using diamond cutting technology, while rebuilding the Starokrestovsky overpass, which was used for construction machinery traffic and constructing two temporary overpasses over the railway tracks to facilitate pedestrian traffic and access for the simultaneous construction of utility networks at Prospect Mira.

Meanwhile, work on a new 1.2km long, six-lane bridge over the Yenisey River in Siberia, scheduled to start this year, has been pushed back until 2011. The project, expected to cost some US$734.3 million (€569.5 million), will be the fourth crossing over the river.

For more information on companies in this article

Related Content

  • Riga's newest bridge improved traffic flow
    May 9, 2012
    An alliance of companies has come together to realise major infrastructure projects in Latvia including its biggest bridge. Patrick Smith reports. Riga, the Latvian capital, has the finest collection of Art Nouveau buildings in Europe and its centre is on the UNESCO World Heritage List. The city of some 750,000 people (the country's total population is 2.2 million) is bounded to the south by Lithuania and to the north by Estonia, and is the second largest in Baltic States. To the east is Russia and Belarus.
  • Golden route to success
    July 20, 2012
    Built in 1937 and still the ninth longest suspension bridge in the world, the Golden Gate Bridge across San Francisco Bay remains in fine shape despite its age - Andrew Bardin Williams writes The Golden Gate Bridge turned 75 years old on May 27 and continues to play a key role in the transportation, engineering, construction and ITS communities. The structure has played an important historical role, an engineering success that boosted the economy of the region. And it also led the way as the first major pub
  • Mini-bridge aids Forth repairs
    July 17, 2012
    An engineering "first" means that rehabilitation work on a vital Scottish bridge built over 40 years ago can be carried out smoothly A new report to the Forth Estuary Transport Authority (FETA) in Scotland recommends appointing Balfour Beatty Civil Engineering of Edinburgh as 'preferred bidder' to carry out the scheduled replacement of the bridge's main expansion joints in 2009. However, the report to the bridge authority says the tender price of £13.7 million (US$21.3 million) is some £5 million ($7.8 mill
  • Doka formwork rises above the Orinoco River in Venezuela
    July 8, 2016
    Taking a road and rail link across one of the biggest rivers in South America, together with its swamps and flood-plain, called for a new crossing of truly superlative dimensions. Two 135.5m pylons for the third bridge across the Orinoco River, at Caicara del Orinoco, in Venezuela took shape with a formwork solution and automatic climbing technology from Doka. The bridge has an overall length of just over 11km and the main bridge is nearly 2.3km long with the roadway 55m above the river. The two ident