Skip to main content

Moscow overpass rebuild key to urban routes

Contractor Mostotrest has finished work on its US$114 million (€88.5 million) project to rebuild the Krestovsky overpasses over the Moscow and Oktyabrskaya railways at Prospect Mira, Moscow. The link is a vital one for Russian’s capital as it is one of the key urban routes linking the Yaroslavskoye Highway with the centre of Moscow. The company started work on the project in 2007 on the decision of the Moscow authorities for CJSC Administration of Capital Development, Utilities, Buildings and Roads (UKSIK
May 14, 2012 Read time: 2 mins
Contractor 2450 Mostotrest has finished work on its US$114 million (€88.5 million) project to rebuild the Krestovsky overpasses over the Moscow and Oktyabrskaya railways at Prospect Mira, Moscow.

The link is a vital one for Russian’s capital as it is one of the key urban routes linking the Yaroslavskoye Highway with the centre of Moscow.

The company started work on the project in 2007 on the decision of the Moscow authorities for CJSC Administration of Capital Development, Utilities, Buildings and Roads (UKSIKSID), the technical customer of the facility. The rebuilding work was handled by Mostotrest’s branch Mostootryad-4, with OJSC Hyprotransmost carrying out the design work.

The work was needed as the original Krestovsky overpasses were built in 1937 and were unable to cope with current (and predicted) traffic volumes.

The work involved combining the two Bolshoy and Maly Krestovsky overpasses into a single 361m long, steel-reinforced concrete span while the roadway was widened to ten lanes.

Despite the proximity of the overpasses to urban road and rail links, the company was able to allow road and rail traffic to continues at normal levels while work was carried out.

The project was complex and during the first stage, Mostootryad-4’s expert team disassembled the spans and slant legs of the original Bolshoy and Maliy Krestovsky overpasses using diamond cutting technology, while rebuilding the Starokrestovsky overpass, which was used for construction machinery traffic and constructing two temporary overpasses over the railway tracks to facilitate pedestrian traffic and access for the simultaneous construction of utility networks at Prospect Mira.

Meanwhile, work on a new 1.2km long, six-lane bridge over the Yenisey River in Siberia, scheduled to start this year, has been pushed back until 2011. The project, expected to cost some US$734.3 million (€569.5 million), will be the fourth crossing over the river.

For more information on companies in this article

Related Content

  • Tender cancelled for fifth section of Moscow’s central ring road
    December 15, 2014
    Russia’s Federal Antimonopoly Service has cancelled the results of a tender for construction and maintenance of the fifth section of the central ring road in the Moscow. The FAS made the announcement following an investigation based on a complaint from Stroygazconsulting, one of Russia’s largest infrastructure construction companies. The 23-year contract was awarded to the Koltsevaya Magistral. Stroygazconsulting complained that the bids for the contract, worth nearly US$752 million, were not evaluate
  • Key UK bridge project for A38
    October 29, 2024
    A key UK bridge project for the A38 over the HS2 route.
  • Danube bridge takes shape
    February 10, 2012
    A new bridge over the River Danube between Bulgaria and Romania is expected to benefit to the economies of both nations. Krasimir Krastanov reports
  • New northern relief road for Moscow
    August 20, 2015
    New Concession Company to build northern relief road of Moscow Kutuzov Avenue – Eugene Gerden writes New Concession Company has won a tender for the building of the Northern relief road of Kutuzovsky Avenue, a major radial avenue in the Russian capital Moscow. The firm is part of Leader company (one of Russia's largest management companies), owned by Yuri Kovalchuk, a well-known Russian businessman, who is reportedly close to Russia’s president Vladimir Putin. It is planned that the building of the n