Skip to main content

Moscow-Kazan highway schedule set

The construction schedule has been set for Russia’s Moscow to Kazan highway project. The project is now expected to cost US$3.75 billion, with the route forming part of the highway connecting Western Europe with China. The stretches connecting Moscow with Vladimir and Kanash with Kazan should be ready for traffic in late 2024. The stretches linking Vladimir with Murom and Murom with Arzamas are due for completion in 2025. The stretches from Arzamas to Kanash should be ready in 2027.
September 25, 2019 Read time: 1 min

The construction schedule has been set for Russia’s Moscow to Kazan highway project. The project is now expected to cost US$3.75 billion, with the route forming part of the highway connecting Western Europe with China. The stretches connecting Moscow with Vladimir and Kanash with Kazan should be ready for traffic in late 2024. The stretches linking Vladimir with Murom and Murom with Arzamas are due for completion in 2025. The stretches from Arzamas to Kanash should be ready in 2027.

Related Content

  • $700 million Congo-Congo bridge project bidding
    March 6, 2025
    Bidding is due to open for the $700 million Congo-Congo bridge project.
  • Controversial Russian bridge opens
    May 16, 2018
    The first stage of a controversial Russian bridge project is now complete, with the link opening to use by cars. The Kerch Strait bridge spans the Black Sea, connecting Russia’s Taman Peninsula in Krasnodar with Crimea, the latter having been controversially annexed by Russia from Ukraine in 2014. The official opening of the 19km-long bridge was carried out by Russia’s president, Vladimir Putin, who drove across the link in a Kamaz truck to reach the city of Kerch. The US$2.7 billion bridge forms part of
  • New Zealand highway proposed
    June 15, 2021
    A potentially controversial tolled highway project has been proposed for New Zealand's South Island.
  • Upgraded road connections for Moscow airports
    May 24, 2012
    All three of Moscow’s main airports are to benefit from major upgrades to their road connections. The authorities in the Russian capital have plans to repair and improve eight key connecting roads to Vnukovo, Domodedovo, and Sheremetyevo airports and with a target date for completion in 2015. The first section of the new Moscow - St Petersburg tolled highway forms part of the new route into Sheremetyevo airport and this is due for completion during 2014. In all some US$5.6 billion will be spent on repairing