Skip to main content

Moscow-Kazan highway schedule set

The construction schedule has been set for Russia’s Moscow to Kazan highway project. The project is now expected to cost US$3.75 billion, with the route forming part of the highway connecting Western Europe with China. The stretches connecting Moscow with Vladimir and Kanash with Kazan should be ready for traffic in late 2024. The stretches linking Vladimir with Murom and Murom with Arzamas are due for completion in 2025. The stretches from Arzamas to Kanash should be ready in 2027.
September 25, 2019 Read time: 1 min

The construction schedule has been set for Russia’s Moscow to Kazan highway project. The project is now expected to cost US$3.75 billion, with the route forming part of the highway connecting Western Europe with China. The stretches connecting Moscow with Vladimir and Kanash with Kazan should be ready for traffic in late 2024. The stretches linking Vladimir with Murom and Murom with Arzamas are due for completion in 2025. The stretches from Arzamas to Kanash should be ready in 2027.

Related Content

  • Over US$2 billion for two Vietnam highway projects
    July 22, 2024
    More than US$2 billion will be invested for two Vietnam highway projects.
  • Russian road projects for St Petersburg and Moscow
    May 16, 2018
    Contractor VAD now looks likely to carry out rebuilding work for the northern stretch of St Petersburg’s Ring Road. This section of the ring road runs between the Priozerskoye Highway and the Western High-Speed Diameter route. VAD’s bid for the 14.3km stretch has received approval from the tender commission. The work will cost just over US$100 million to be carried out and should be complete by November 2020.
  • Moscow motorway project being planned
    October 24, 2017
    The city authorities in Russia’s capital Moscow are planning the construction of a new stretch of highway. The North-East Expressway will provide a connection between the existing Dmitrovskoe and Yaroslavskoe Highways. The new route will measure 13km long and design work should be complete by the end of 2018, with construction intended to be finished by 2020. Once the new link is complete it should help reduce the city’s notorious peak time traffic congestion.
  • New CIS highway connection planned
    August 19, 2016
    Plans are being set out for an important new highway link in the CIS. This new link will connect the M-5 and M-7 highways, close to the city of Ufa and the project is expected to cost US$1.12 billion to carry out. The work will require the construction of a tunnel stretch carrying four traffic lanes, as well as two highway sections and an overpass in the city itself. Ufa is the capital of the Republic of Bashkortostan, which is part of the CIS. The city is linked to Russia’s capital Moscow by the M-7 highwa