Skip to main content

Moscow to build over 200km of roads in next three years

Deputy Mayor of Moscow for Town-Planning Policy and Construction Marat Khusnullin says over 200km of roads and 60km of subway lines will be built in the city in the next three years. A total 46 transport facilities will also be constructed, the Deputy Mayor has confirmed.
March 13, 2014 Read time: 1 min
Deputy Mayor of Moscow for Town-Planning Policy and Construction Marat Khusnullin says over 200km of roads and 60km of subway lines will be built in the city in the next three years. A total 46 transport facilities will also be constructed, the Deputy Mayor has confirmed.

Related Content

  • Third section of Moscow ring road project
    August 10, 2017
    Financing is being secured for the project to build the third section of Moscow’s ring road. A loan worth around US$642 million will be provided by three banks, the Sberbank, Gazprombank and Eurasian Development Bank (EDB). This section of the ring road lies to the north of the city and measures 105.3km long. The loan for the PPP toll road will be for a 16-year period with the building work being carried out by the Road Construction Corporation. The ring road forms an important link in the chain for the roa
  • Moscow’s road infrastructure timetable to 2016
    August 23, 2013
    According to plans for Moscow road infrastructure, issued by the Department of Construction, 215km of roads, 78 artificial structures and around 150 pedestrian underpasses should be reconstructed and built in Russia’s capital by 2016. Around 87.3km of road surface will be renovated and 11 artificial structures will be built on 11 major highways. Another 30.5km of roads and eight artificial structures will open as a part of a new road network project for the development of Skolkovo innovation centre. A fu
  • Moscow overpass rebuild key to urban routes
    May 14, 2012
    Contractor Mostotrest has finished work on its US$114 million (€88.5 million) project to rebuild the Krestovsky overpasses over the Moscow and Oktyabrskaya railways at Prospect Mira, Moscow. The link is a vital one for Russian’s capital as it is one of the key urban routes linking the Yaroslavskoye Highway with the centre of Moscow. The company started work on the project in 2007 on the decision of the Moscow authorities for CJSC Administration of Capital Development, Utilities, Buildings and Roads (UKSIK
  • Tender cancelled for fifth section of Moscow’s central ring road
    December 15, 2014
    Russia’s Federal Antimonopoly Service has cancelled the results of a tender for construction and maintenance of the fifth section of the central ring road in the Moscow. The FAS made the announcement following an investigation based on a complaint from Stroygazconsulting, one of Russia’s largest infrastructure construction companies. The 23-year contract was awarded to the Koltsevaya Magistral. Stroygazconsulting complained that the bids for the contract, worth nearly US$752 million, were not evaluate