Skip to main content

Morroco’s RN9 could get tunnels to improve safety

One of Morocco’s most dangerous roads could get tunnels in a bid to improve its safety. A feasibility study on the potential installation of tunnels on the RN9 mountain-passing route will begin in December 2014.
January 9, 2014 Read time: 1 min
One of Morocco’s most dangerous roads could get tunnels in a bid to improve its safety. A feasibility study on the potential installation of tunnels on the RN9 mountain-passing route will begin in December 2014.

Related Content

  • Morocco infrastructure study opening for tender
    April 21, 2016
    Morocco is planning a new infrastructure programme. The country’s Ministry of Equipment, Transport and Logistics is introducing a new tender scheme for a study that will be used to establish the national road infrastructure scheme (Snir) by 2035.
  • Work begins on Stockholm’s new bypass
    August 22, 2016
    The first tunnels are being excavated for the huge bypass tunnel in Sweden’s capital Stockholm – Adrian Greeman writes. After years of preparation and design, blasting and rock moving for Sweden's largest infrastructure project began south of the city this year. It sets in train a decade-long project that will create a new half-ring dual three-lane motorway for the city, 20km long. With most of it deep underground, it will also be one of Europe's largest ever road tunnels. The scheme is aimed at transformin
  • Norwegian tunnels needs safety improvements
    August 17, 2015
    Investigations into tunnel safety in Norway have revealed that there are 148 requiring safety upgrades. The 148 tunnels do not meet current EU safety requirements. The EU's road tunnel safety directive was introduced in 2007 and the deadline for the work to be carried out is April 1st, 2019. The necessary upgrade is estimated to cost €873.82 million.
  • Chile-Argentina Agua Negra Tunnel latest news
    September 28, 2017
    Interest is strong in the project to build the Agua Negra Tunnel, which will connect Chile and Argentina. So far 10 consortia have been pre-selected to enter the bidding process for the project. However Ebitan, the joint Chilean/Agentinian commission with responsibility for the project has said it will not release the names of the consortia that have been pre-selected until November 2017 instead.