Skip to main content

Morocco key bypass section complete

Work on the first stretch of the US$55.6 million bypass around Rabat is now complete. The 6km stretch of the N°2 Rabat-Salé route forms part of a wider plan to develop Rabat. The final stretch linking El Oulja with the N°6 national road should be complete in the next few months. The new bypass is intended to reduce the chronic congestion that can occur in the area at peak periods, resulting in far longer travel times for drivers. Morocco’s growing economy has resulted in a parallel growth in vehicle numbers
January 10, 2018 Read time: 1 min

Work on the first stretch of the US$55.6 million bypass around Rabat is now complete. The 6km stretch of the N°2 Rabat-Salé route forms part of a wider plan to develop Rabat. The final stretch linking El Oulja with the N°6 national road should be complete in the next few months. The new bypass is intended to reduce the chronic congestion that can occur in the area at peak periods, resulting in far longer travel times for drivers. Morocco’s growing economy has resulted in a parallel growth in vehicle numbers in the country, increasing traffic congestion right across the country’s key cities.

Related Content

  • Vietnam’s North-South Expressway sections
    March 24, 2025
    Key sections of Vietnam’s North-South Expressway are nearly complete.
  • PPRS Nice 2018: maintenance moves mountains
    June 22, 2018
    Strategic maintenance was a major theme at the second Pavement Preservation and Recycling Summit in Nice, France. The world is changing, mobility is changing and so roads must change and adapt for the future.” With this brief statement, Jacques Tavernier opened the second PPRS Summit. “At the same time there is a growing awareness of poor or non-existent maintenance for highways. The question for this conference is how to adapt road maintenance in the face of this challenge,” said Tavernier, in his role as
  • Nicaragua road project funding deal
    February 1, 2018
    Nicaragua’s Ministry of Transport and Infrastructure (MTI) is setting out its road development programme for 2018. In all the plans call for the construction of 171km of roads. Work will be completed for the road from Mulukuku to Siuna, with the first 23km stretch due to open in September 2018 and the remaining 21.5km expected in December 2018. Meanwhile the road from Nueva Guinea to San Francisco should be complete by November 2018. Work started on these two routes in 2016. The project also calls for
  • Increase in distances driven in the US
    February 23, 2016
    Drivers in the US have set a new record for total distance travelled. New data released today by the U.S. Department of Transportation’s (USDOT) Federal Highway Administration (FHWA) show that US driving reached 5.0368 trillion km (3.148 trillion miles) by the end of 2015, beating the previous record of 4.8048 trillion km (3.003 trillion miles) in 2007.