Skip to main content

Montreal's new Champlain Bridge ready by 2018

Montreal’s Champlain Bridge will be replaced by 2018, according to the Canadian federal government. The government pledge is three years earlier than the original plans to replace the landmark structure. The new US$ 4.71 billion (CAD 5 billion) toll bridge is to be constructed through a public-private partnership and the procurement process is set to commence in spring 2014. Poul Ove Jensen has been selected by the government to design the replacement Champlain Bridge which, with its almost 160,000 daily
December 2, 2013 Read time: 1 min
Montreal’s Champlain Bridge will be replaced by 2018, according to the Canadian federal government. The government pledge is three years earlier than the original plans to replace the landmark structure.

The new US$ 4.71 billion (CAD 5 billion) toll bridge is to be constructed through a public-private partnership and the procurement process is set to commence in spring 2014.

Poul Ove Jensen has been selected by the government to design the replacement Champlain Bridge which, with its almost 160,000 daily crossings, is Canada’s busiest bridge.

Related Content

  • George Massey Tunnel Replacement gets environmental approval
    February 13, 2017
    The Canadian province of British Columbia has given environmental approval for a 10-lane US$2.8 billion bridge to replace the ageing George Massey Tunnel near Vancouver. However, approval for the 3km cable stay bridge over the Fraser River comes with 33 conditions, according to Canadian media. Construction of the toll bridge will also mean replacing the interchanges of Westminster Highway, Steveston Highway and Highway 17A.
  • Cowi wins Massey Tunnel design
    July 22, 2022
    Cowi has won a contract as owner's engineer for an eight-lane replacement immersed tunnel under the Fraser River near the Pacific coast city of Vancouver. Cowi said it will draw on its experience designing the original four-lane George Massey Tunnel in 1959 and whose removal the engineering firm will later oversee.
  • Canadian PM Trudeau warned of costs rises for Gordie Howe Bridge
    January 11, 2016
    A devaluing Canadian dollar has pushed up the cost for building a signature Windsor-Detroit bridge by around US$2.5 billion, according to Canadian media reports. The increase more than doubles what was believed needed by the Canadian government to construct the Gordie Howe Bridge, named after a Canadian ice hockey player who played most of his career for the Detroit Red Wings. The toll bridge, to be built under a public private partnership, will link the US city of Detroit, in the state of Michigan, w
  • Systra, Kiewit and Hatch to build third bridge in Kingston, Canada
    August 31, 2018
    Kingston, Canada, has selected Systra International Bridge Technologies, Peter Kiewit Sons and Hatch as the preferred consortium for the design and build Third Crossing project. Seven international teams answered the requests for proposals in February and 2018 with Systra, Kiewit and Hatch eventually chosen from a shortlist of three groups. The consortium will use an integrated project delivery model for the two-lane 1.2km bridge with a pedestrian and cycle path over the Cataraqui River will connect