Skip to main content

Montreal’s critical list of deteriorating bridges and tunnels has doubled

The number of Montreal’s bridges and tunnels in a “critical” condition has more than doubled during the past 12 months, says a shocking new report looking at the state of the city’s transport infrastructure. The new report, which came out this month, shows that 27 of the city’s 587 highway structures reached “critical condition” in 2011 compared with only 12 in 2010.
September 3, 2012 Read time: 4 mins
The number of Montreal’s bridges and tunnels in a “critical” condition has more than doubled during the past 12 months, says a shocking new report looking at the state of the city’s transport infrastructure. The new report, which came out this month, shows that 27 of the city’s 587 highway structures reached “critical condition” in 2011 compared with only 12 in 2010.

There is no need to panic though, says Richard Deschamps, executive committee vice-president in charge of the Canadian city’s infrastructure, this does not mean that Montreal’s road system has become more dangerous. According to Deschamps, a much more frequent and intensive inspection regime is the real reason why an increased number of problems has come to light.

“Our inspection program has allowed us to have a very good understanding of the state of our structures,” he said. “That’s what allows us to act quickly.” And, in an attempt to reassure the public, he said “we do not compromise with the safety of Montrealers in any way when we talk about tunnels, bridges and roads.” The improved inspection programme will allow the city to react quickly more efficiently.

However, opposition leader Louise Harel of Vision Montreal is not convinced and she is worried that the city is spending less money as the problem grows. “The situation is getting worse and worse and we are investing less money in the next three years than was promised,” she says. “We have to sound the alarm.”

And fellow protester Richard Bergeron of 6490 Projet Montréal is arguing that the city continues to invest millions of dollars in non-essential projects while allowing the road network to deteriorate.“The state of the city is disquieting to say the least,” says Bergeron. “When you use the word ‘critical,’ surely that tells you something.”

Claude Carette, city transportation director, does not agree, pointing out that the latest figures indicate an overall status quo. He noted that while 6% of the city’s structures showed deterioration, another 6% were improved. This month’s report rated 386 bridges and tunnels or 69% of the structures as “good.” This was slightly better than last year’s figure of 68%. Another 79 or 14% were rated as “deteriorating,” compared with 15% in last year’s report.

25 or 5% were rated as “deficient,” down from 8% last year, and 38 or 7% remain “mediocre.” However, the sting came when 27 or 5% were classified as “critical,” compared with 12 or 2% last year.

For Deschamps, these “ratings are simply an indication of the work that has to be done. We use them to assess what work should be done. They are not an indication of the danger to the public. We can affirm that our structures are vigorously inspected annually.”

Montreal will spend US $109 million (Can $108 million) from 2013 to 2015 on the repair of its road bridges and tunnels, with $44.5 million (Can $44 million) slated for 2013 and the rest equally divided between the next two years. This is about 30% down on last year’s spend. Deschamps says that improved management has allowed the city to reduce the expenditures. He believes that that Montreal’s taxpayers are reaching the limit of their ability to pay and therefore federal and provincial governments should kick in more money.

Deschamps said the city is seeking $555 million (Can $550) million from the provincial and federal governments to help pay for infrastructure improvements over the next 10 years. He said the city has not received any commitments from Premier Jean Charest or the other party leaders to the city’s demands. About 58% of the road structures were built prior to 1970 and decades of neglect by previous administrations has resulted in a crumbling infrastructure and high repair costs, Deschamps argues.

This autumn, Montreal will demolish the bridge on Upper Lachine Road and replace it with a land-based road. The city will also perform major repairs on the Jolicoeur Bridge in Verdun. And several structures labelled “critical” across the city have been closed down and no work is scheduled to rebuild them. These include the Wellington Tunnel under the Lachine Canal as well as the Beaudry Tunnel on Notre Dame East to the Port of Montreal. “If, after an inspection, the public is in danger then we will close the structure,” Deschamps said.

For more information on companies in this article

Related Content

  • Asecap Days – Istanbul 2023
    February 16, 2024
    The “vast lakes of data” collected daily by global highway operators are going to waste meaning opportunities to improve services and boost revenue are continually lost. This must change, reports Geoff Hadwick from the ASECAP Days 2023 conference in Istanbul.
  • Highway 99 revisited
    March 6, 2024
    David Arminas recently returned to Seattle for an inside look at some of the features of the now-complete SR99 tunnel that was a World Highways key project report in November 2017.
  • Meet Die Autobahn des Bundes
    November 8, 2021
    Only recently has Germany created a central organisation to maintain and develop the nation’s 13,200km of motorways, called autobahns. Moving from 16 state-run operation centres to one lead centre is a challenge but essential, says Gerd Riegelhuth.
  • Future-proofing construction & quarrying equipment sustainability
    February 16, 2023
    Sustainability is a huge topic across the construction and quarrying industry – not just in terms of what can be achieved tomorrow via carbon-free hydrogen fuel cells and hydrogen internal combustion engines of machine fleets, but today, through the use of smart technology to make jobsites more efficient and sustainable by getting work done right first time, every time