Skip to main content

Montreal’s Champlain Bridge superstructure deal signed with Canam-Bridge

Canada-based Canam-Bridge has been chosen to fabricate the superstructure for the Champlain bridge project in Montreal as well as to supply steel. Marc Dutil, chief executive of Canam, a specialist bridge superstructure fabricator, expects at least 45,000tonnes of steel will be required for the 3.4km bridge that will span the St. Lawrence River which leads to the Great Lakes of North America. The contract is expected to be completed after a formal deal is reached between the SNC-Lavalin consortium con
May 22, 2015 Read time: 2 mins
Canada-based Canam-Bridge has been chosen to fabricate the superstructure for the Champlain bridge project in Montreal as well as to supply steel.

Marc Dutil, chief executive of Canam, a specialist bridge superstructure fabricator, expects at least 45,000tonnes of steel will be required for the 3.4km bridge that will span the St. Lawrence River which leads to the Great Lakes of North America.

The contract is expected to be completed after a formal deal is reached between the SNC-Lavalin consortium constructing the bridge and the federal government this summer.

The bridge has an estimated cost of US$2.5-4.1 billion. Canam-Bridges is the business unit that oversees the design and sale of steel bridges, structural bearings and expansion joints in the highway and railway bridge sectors in Canada and numerous states in the US.

The new bridge will span the St. Lawrence River from the île des Soeurs to Brossard, immediately downstream from the existing Champlain Bridge. It is expected to feature a three-corridor design, including two three-lane corridors for vehicle traffic and a two-lane public transport corridor capable of accommodating a light rail transit system. The new bridge will also include a multi-use path for pedestrians and cyclists.

World Highways reported in April that the Canadian government had awarded the multi-billion dollar contract for the Champlain Bridge, in the province of Quebec, to a consortium led by SNC-Lavalin. The firm, based in Montreal, will design, build, maintain and operate the toll bridge under a 35-year public-private partnership deal.

The consortium called Signature on the Saint-Lawrence Group includes Spanish firms 4761 Dragados Canada and 917 ACS Infrastructures and the US firm 2758 Flatiron Construction. Other members are MMM Group, T.Y. Lin International, International Bridge Technologies Canada and 981 Hochtief PPP Solutions.

For more information on companies in this article

Related Content

  • Teams shortlisted for Pattullo Bridge replacement near Vancouver
    March 1, 2019
    The Canadian province of British Columbia has shortlisted three consortia to design and build a US$1.06 billion Pattullo Bridge replacement near Vancouver. Fraser Community Connectors is led by Kiewit Canada Development. Kiewet Infrastructure BC is the design-build contractor. The long-span bridge design contractors are T.Y. Lin International and International Bridge Technologies. A joint venture of Flatiron Constructors, Dragados Canada and Carlson Construction Pattullo includes ACS Infrastructure Ca
  • Flatiron wins Winnipeg interchange project in Canada
    August 5, 2015
    US-based contractor Flatiron has won a US$157 million design and build contract for an interchange in the Canadian city of Winnipeg, in the province of Manitoba. The project, for owner Manitoba Infrastructure and Transportation, will replace the existing loop-ramp interchange for Provincial Trunk Highways 59 and 101. Work includes seven precast girder bridges between 40m and 100 meters in length, one cast-in-place box culvert through-pass, construction of 1.5 million cubic meters of interchange embank
  • JCCBI says US$300m for demolishing Montreal’s old Champlain Bridge
    April 11, 2017
    Tearing down the old steel truss cantilever Champlain Bridge in Montreal could cost around US$300 million, according to preliminary estimates by a federal government agency. Also, until the nearby new Champlain Bridge is finished, it will cost US$93 million annually to maintain the old one, according to Jacques Cartier and Champlain Bridges Incorporated (JCCBI), the federal Canadian agency that oversees several major road infrastructure assets in the city. Dismantling will start in 2019 at the earliest and
  • International firms compete in US bridge project tenders
    May 2, 2012
    The Spanish construction firm ACS is tendering for the construction and operation of four bridges in the US. The firm is tendering in partnership with some other US and international firms for some of the projects, which are worth a total of US$11.4 billion. The Tappan Zee project is expected to cost $5 billion and the deal will be for a design and construction contract. The bridge will be located in New York, is being developed by New York State Thruway Authority and will require two, four-carriageway brid