Skip to main content

Montreal’s Champlain Bridge opens but late and over-budget

Montreal’s US$3.5-billion, 3.4km-long Samuel de Champlain Bridge has opened after four years of construction and months of delays, according to Canadian media reports. Work is continuing on the cycle and pedestrian paths and eventually a light-rail train will run down the middle of the six lane bridge over the St. Lawrence River. The new structure has a life-span of 125 years and runs alongside its namesake Champlain Bridge, a steel truss cantilever that opened in 1962 which will be demolished. Accord
June 27, 2019 Read time: 2 mins
Montreal’s Champlain Bridge opens but late and over-budget
Montreal’s US$3.5-billion, 3.4km-long Samuel de Champlain Bridge has opened after four years of construction and months of delays, according to Canadian media reports.


Work is continuing on the cycle and pedestrian paths and eventually a light-rail train will run down the middle of the six lane bridge over the St. Lawrence River.

The new structure has a life-span of 125 years and runs alongside its namesake Champlain Bridge, a steel truss cantilever that opened in 1962 which will be demolished. According to media reports, the old bridge was the busiest in Canada, carrying over 50 million vehicles a year and an estimated $15 billion worth of trade.

Signature on the St Lawrence (SSL) - led by Canada-based SNC-Lavalin Group - is the private consortium that built the six-lane public-private project under a 30-year contract.

The new and old bridges are named after the French explorer Samuel de Champlain who founded Quebec City, the Quebec province’s capital, in 1608. Work includes construction of a smaller bridge for Île des Soeurs - Nun’s Island - and widening Autoroute 15 through the centre of Montreal.

World Highways %$Linker: 2 External <?xml version="1.0" encoding="utf-16"?><dictionary /> 0 0 0 link-external reported false https://www.worldhighways.com/categories/road-highway-structures/features/montreals-new-champlain-bridge-is-shaping-up-for-christmas/ false false%> on the progress of the bridge last year.

Related Content

  • Angry wife tells husband it’s over with a message on a freeway billboard
    October 9, 2015
    Billboards are used to advertise everything, from toothpaste to airplanes and also to get a message across, such as don’t litter the highway. But one wife in Sheffield, United Kingdom, decided to make it personal, and tell her cheating husband that it was all over.
  • Superior Industries seeks to meet new dealers at bauma 2013
    January 6, 2017
    Superior Industries, which claims to be North America’s only combination manufacturer of conveyor systems and their related accessories, has said it plans to pursue new international dealer candidates at bauma 2013. It is asking dealers interested in distributing its brand of conveying equipment and/or conveyor components to complete a pre-show questionnaire at superior-ind.com/bauma.
  • Superior Industries seeks to meet new dealers at bauma 2013
    January 28, 2013
    Superior Industries, which claims to be North America’s only combination manufacturer of conveyor systems and their related accessories, has said it plans to pursue new international dealer candidates at bauma 2013. It is asking dealers interested in distributing its brand of conveying equipment and/or conveyor components to complete a pre-show questionnaire at superior-ind.com/bauma.
  • Goldhofer rescues O&K RH 120-E from Calenturitas de Prodeco Mine
    November 1, 2016
    It was reportedly a logistical challenge to collect a massive front shovel excavator from the open pit coal mine Calenturitas de Prodeco in north-eastern Colombia. The twin engines of the 290-tonne O&K RH 120-E mining excavator had given up the ghost and could not be repaired on site, leaving the monster stranded atop a high mound of earth. So the mining company contracted heavy haulage specialist Boom Logistics to collect the excavator and transport it to the repair shop 22km away. http://www.goldho