Skip to main content

Montenegro plans new bridge and tunnel construction projects

Construction of a bridge and two new tunnels on Montenegro’s Bar-Boljare highway will go ahead. Permission for the projects was given by the country’s Ministry of Sustainable Development. The work is for the new Zagradje Bridge link as well as the Mrki Krs and Durilovac tunnels, which will be constructed for the 41km highway stretch from Smokovac to Matesevo. The Zagradje Bridge will in fact feature dual structures carrying traffic in either direction, with one measuring 100m long and the other 150m. The co
May 12, 2017 Read time: 2 mins

Construction of a bridge and two new tunnels on Montenegro’s Bar-Boljare highway will go ahead. Permission for the projects was given by the country’s Ministry of Sustainable Development. The work is for the new Zagradje Bridge link as well as the Mrki Krs and Durilovac tunnels, which will be constructed for the 41km highway stretch from Smokovac to Matesevo. The Zagradje Bridge will in fact feature dual structures carrying traffic in either direction, with one measuring 100m long and the other 150m. The construction will be carried out jointly by the contractors 3366 China Road and Bridge Corporation (CRBC) and Tingdzi Peng as well as three local firms, Putin, Geo Max and Ingenium. Construction of the highway stretch joining Smokovac, Uvac and Matesevo commenced in May 2015. The complexity of this highway is a result of the difficult terrain along the route. This has resulted in the comparatively high pricetag of €800 million with the work including building four major junctions, five viaducts, 13 bridges and 16 tunnel sections.

For more information on companies in this article

Related Content

  • India’s new expressway link
    April 12, 2021
    Accelerated road construction methods are being used to build an expressway link in India, setting records along the way
  • Innovative new drainage solutions will help keep roads free from water
    October 2, 2014
    An array of new technologies will help optimise road drainage and minimise flooding risks - Mike Woof reports In the UK the specialist contractor Lanes Group has carried out extensive inspection work of the drainage systems for the M6 toll route around the city of Birmingham. A powerful zoom camera has been used to carry out the inspection work for Midland Expressway, which operates and maintains the 43km-long motorway, running from Coleshill to Cannock.
  • Sandvik on drill at the Liantang/Heung Yuen Wai Boundary project
    April 4, 2018
    The Liantang/Heung Yuen Wai Boundary Control Point project is creating a seventh land crossing, including highways and tunnels, between Shenzhen in China and Hong Kong There are already two control points on the eastern side of the New Territories between China and Hong Kong - at Man Kam To and Sha Tau Kok – to access eastern Shenzhen and Guangdong. All cross-boundary traffic travelling from these points must use busy local roads in Hong Kong and Shenzhen before joining the major highway systems. The US
  • US$4 billion bridge and highway project
    June 14, 2024
    A US$4 billion bridge replacement and highway upgrade project is planned for the US.