Skip to main content

Montenegro highway project

Construction of Montenegro’s Bar-Bolijare highway project is being accelerated. This will ensure that the work remains on schedule and will be able to meet the planned completion date.
July 10, 2017 Read time: 1 min

Construction of Montenegro’s Bar-Bolijare highway project is being accelerated. This will ensure that the work remains on schedule and will be able to meet the planned completion date. The project is being carried out by Chinese contractor China Roads and Bridges Company (CRBC). The firm is building the stretch from Podgorica to Matesevo, with the work look set to remain within the planned €194 million budget. So far 16 of the necessary construction permits have been awarded for the project with another due for approval shortly.

Related Content

  • Odebrecht wins Brazilian highway concession
    November 29, 2013
    Odebrecht has been awarded a concession for Brazil’s important BR-163 federal highway route. The 851km section of highway runs through Mato Grosso state and the deal is worth some US$2 billion, according to a report by Business News Americas. As part of its contract, Odebrecht will have to widen a 454km stretch of the route within five years and is also required to build nine new toll booths.
  • Chinese firms to work on Serbia’s Corridor 11 project
    November 30, 2015
    Serbia and China have signed a memorandum of understanding for construction of two sections of Serbia’s Corridor 11. The MoU was inked in during Serbian Prime Minister Aleksandar Vucic’s visit to the Chinese capital Beijing last week. Serbia’s Tanjug news agency reported that Vucic said the deal was worth around €209 million and included construction of the 18km Surcin-Obrenovac bridge. Corridor 11 runs from the Serbian capital Belgrade southwest to the border with Montenegro, another member state of
  • Budget set for Zimbabwe highway deal
    November 12, 2018
    The budget has been set at US$693 million for the Zimbabwe’s highway running between Harare, Masvingo and Beibridge.
  • Costa Rica concrete repairs
    February 15, 2012
    Work has started on the long awaited San Jose-Caldera Highway in Costa Rica, following numerous delays and setbacks. The new 77.5km highway will be used daily by more than 81,000 vehicles, reducing the travel time between the Central Valley and the Central Pacific Coast by at least 30 minutes.