Skip to main content

Miami interstate highway redesign project commencing

Planning work is being carried out for a major interstate redesign project in Miami, Florida. The US$802 million project involves the redesign of I-395 and surveying activities are now commencing. The I-395/SR 836/I-95 Project is being carried out in partnership between the Florida Department of Transportation (FDOT) and the Miami-Dade Expressway Authority (MDX). The work will be carried out between State Road (SR) 836 beginning at NW 17 Avenue and continuing through the SR 836/I-395/I-95 (Midtown) Intercha
January 18, 2019 Read time: 2 mins

Planning work is being carried out for a major interstate redesign project in Miami, Florida. The US$802 million project involves the redesign of I-395 and surveying activities are now commencing. The I-395/SR 836/I-95 Project is being carried out in partnership between the 2697 Florida Department of Transportation (FDOT) and the Miami-Dade Expressway Authority (MDX). The work will be carried out between State Road (SR) 836 beginning at NW 17 Avenue and continuing through the SR 836/I-395/I-95 (Midtown) Interchange to the MacArthur Causeway Bridge. Meanwhile the limits on I-95 are from NW 8 Street to NW 29 Street.

The project is due for completion in the third quarter of 2023 and includes building major bridge links, such as the signature bridge over NE2 Avenue and Biscayne Boulevard and a double-decked section of SR 836 over the Miami River.

According to the project partners, this work will deliver key benefits for safety and mobility. Safety will be improved for commuters by reducing weaving movements associated with drivers entering and exiting SR 836 and I-95 at the Midtown Interchange. Safety will also be enhanced for pedestrians under the new I-395 bridges with creation of a contiguous trail from NW 3 Avenue to Biscayne Boulevard, better crosswalks and new bike lanes. Meanwhile mobility will be improved for residents, commuters and tourists by increasing capacity on SR 836, I-95 and I-395. SR 836 will be double-decked to allow for a direct connection between SR 836 and I-395. Mobility in Overtown will also be improved with the connection of NW 2 Avenue under I-395 and improvements to arterial roads.

For more information on companies in this article

Related Content

  • Interchange project wins major engineering award
    December 11, 2015
    The Section 5 Palmetto SR826/836 Interchange project in Florida has won the 2016 FICE Engineering Excellence Grand Award in the Structures category.
  • South Carolina highway deal for Michael Baker International
    June 21, 2016
    Engineering and consultancy firm Michael Baker International will work on a major highway reconstruction project in Colombia, South Carolina. The project is intended to improve the commute for drivers in the state. The South Carolina Department of Transportation (SCDOT) has awarded Michael Baker International a US$8.8-million contract to provide construction engineering and inspection services for an 17.6km section of Interstate 20 (I-20) in Lexington County. The section of I-20 is a main artery into and
  • New funding for 44 infrastructure projects
    December 26, 2024
    New funding awards escalate the launch of 44 major infrastructure projects.
  • Lane Construction to carry out Florida highway deal
    November 24, 2017
    Lane Construction Corporation will carry out construction work worth US$134.6 million on a stretch of highway in Florida. This 21km section of the new Suncoast Parkway 2 will run to the north of Tampa, along Florida’s western coast. The route is intended to be a major transport corridor for the state and will feature four lanes. Called SR 589, the tolled route will run from South of SR 700 (US 98) to SR 44 in Hernando and Citrus Counties. Lane Construction is building the second of two sections of the Sunco