Skip to main content

Miami interstate highway redesign project commencing

Planning work is being carried out for a major interstate redesign project in Miami, Florida. The US$802 million project involves the redesign of I-395 and surveying activities are now commencing. The I-395/SR 836/I-95 Project is being carried out in partnership between the Florida Department of Transportation (FDOT) and the Miami-Dade Expressway Authority (MDX). The work will be carried out between State Road (SR) 836 beginning at NW 17 Avenue and continuing through the SR 836/I-395/I-95 (Midtown) Intercha
January 18, 2019 Read time: 2 mins

Planning work is being carried out for a major interstate redesign project in Miami, Florida. The US$802 million project involves the redesign of I-395 and surveying activities are now commencing. The I-395/SR 836/I-95 Project is being carried out in partnership between the 2697 Florida Department of Transportation (FDOT) and the Miami-Dade Expressway Authority (MDX). The work will be carried out between State Road (SR) 836 beginning at NW 17 Avenue and continuing through the SR 836/I-395/I-95 (Midtown) Interchange to the MacArthur Causeway Bridge. Meanwhile the limits on I-95 are from NW 8 Street to NW 29 Street.

The project is due for completion in the third quarter of 2023 and includes building major bridge links, such as the signature bridge over NE2 Avenue and Biscayne Boulevard and a double-decked section of SR 836 over the Miami River.

According to the project partners, this work will deliver key benefits for safety and mobility. Safety will be improved for commuters by reducing weaving movements associated with drivers entering and exiting SR 836 and I-95 at the Midtown Interchange. Safety will also be enhanced for pedestrians under the new I-395 bridges with creation of a contiguous trail from NW 3 Avenue to Biscayne Boulevard, better crosswalks and new bike lanes. Meanwhile mobility will be improved for residents, commuters and tourists by increasing capacity on SR 836, I-95 and I-395. SR 836 will be double-decked to allow for a direct connection between SR 836 and I-395. Mobility in Overtown will also be improved with the connection of NW 2 Avenue under I-395 and improvements to arterial roads.

For more information on companies in this article

Related Content

  • Sri Lanka's new highway - on track
    February 14, 2012
    Work is progressing on-track on Sri Lanka's Southern Expressway project. This will be the country's first expressway and is expected to be completed by 2012, removing the bulk of traffic from the existing coastal road that is highly congested and also has serious safety issues.
  • Romanian highway works commencing
    July 15, 2022
    Highway works are commencing in Romania.
  • Lane picks up Florida SR408 widening project in Orange County
    July 18, 2017
    Lane Construction Corporation has won a US$76 million contract to widen a section of State Road 408 in Orange County, Florida.The project entails adding a thirds lane to each carriageway over a 5.2km stretch of SR408. It will also involve widening a ramp from two lanes to three lanes, adding sound walls as well as extra open road tolling - ORT - lanes.
  • East End Crossing Project—Availability payment P3 in action
    July 14, 2017
    Indiana exercised its authority to use a P3 contract when it partnered with Kentucky for new bridges across the Ohio River. Barney Allison and John Smolen* explain the groundbreaking availability payment deal. Earlier this year, traffic began rolling over the new tolled Lewis and Clark Bridge spanning the Ohio River from northern Kentucky to southern Indiana. The cable-stayed bridge is part of the award-winning Ohio Bridges Project to untangle traffic within the greater metropolitan area of Louisville, Kent