Skip to main content

Miami interstate highway redesign project commencing

Planning work is being carried out for a major interstate redesign project in Miami, Florida. The US$802 million project involves the redesign of I-395 and surveying activities are now commencing. The I-395/SR 836/I-95 Project is being carried out in partnership between the Florida Department of Transportation (FDOT) and the Miami-Dade Expressway Authority (MDX). The work will be carried out between State Road (SR) 836 beginning at NW 17 Avenue and continuing through the SR 836/I-395/I-95 (Midtown) Intercha
January 18, 2019 Read time: 2 mins

Planning work is being carried out for a major interstate redesign project in Miami, Florida. The US$802 million project involves the redesign of I-395 and surveying activities are now commencing. The I-395/SR 836/I-95 Project is being carried out in partnership between the 2697 Florida Department of Transportation (FDOT) and the Miami-Dade Expressway Authority (MDX). The work will be carried out between State Road (SR) 836 beginning at NW 17 Avenue and continuing through the SR 836/I-395/I-95 (Midtown) Interchange to the MacArthur Causeway Bridge. Meanwhile the limits on I-95 are from NW 8 Street to NW 29 Street.

The project is due for completion in the third quarter of 2023 and includes building major bridge links, such as the signature bridge over NE2 Avenue and Biscayne Boulevard and a double-decked section of SR 836 over the Miami River.

According to the project partners, this work will deliver key benefits for safety and mobility. Safety will be improved for commuters by reducing weaving movements associated with drivers entering and exiting SR 836 and I-95 at the Midtown Interchange. Safety will also be enhanced for pedestrians under the new I-395 bridges with creation of a contiguous trail from NW 3 Avenue to Biscayne Boulevard, better crosswalks and new bike lanes. Meanwhile mobility will be improved for residents, commuters and tourists by increasing capacity on SR 836, I-95 and I-395. SR 836 will be double-decked to allow for a direct connection between SR 836 and I-395. Mobility in Overtown will also be improved with the connection of NW 2 Avenue under I-395 and improvements to arterial roads.

For more information on companies in this article

Related Content

  • New Florida toll road under construction
    June 27, 2016
    Superior Construction will build the fifth and final section of Florida’s Wekiva Parkway Project in the US. The US$38.65 million contract was awarded by the Central Florida Expressway Authority (CFX). Superior’s section of the project will be from Kelly Park Road and Country Road 436/Mount Plymouth Road. This work will commence in early August 2016 and should be completed by January 2018. The Wekiva Parkway is being planned jointly between CFX, the Florida Department of Transportation and Florida’s Turn
  • Turkey’s new Marmara Highway project
    June 8, 2017
    By the end of 2018, a shiny new strip of asphalt will skirt around Turkey’s largest city, Istanbul, providing a new transport connection.
  • Expectations for growth of UAE infrastucture
    February 9, 2012
    The INTERMAT Middle East event is being launched at a pivotal time of major infrastructure development in the region. As with most sectors, the highways industry has not had a fantastic 18 months in the Gulf. Not only has the recession impacted the delivery of projects across the board, GCC Governments' attention have been switching increasingly to rail, as plans to roll out a Gulf-wide rail system gather steam. GCC countries will invest over US$119.6 billion in infrastructure projects over the next decade
  • Wrong time to end right turns?
    March 15, 2024
    Banning right-hand turns after stopping for a red light is gaining momentum in the US. But debate continues about whether it will result in fewer incidents between vehicles and alternative mobility users. David Arminas reports.