Skip to main content

Miami interstate highway redesign project commencing

Planning work is being carried out for a major interstate redesign project in Miami, Florida. The US$802 million project involves the redesign of I-395 and surveying activities are now commencing. The I-395/SR 836/I-95 Project is being carried out in partnership between the Florida Department of Transportation (FDOT) and the Miami-Dade Expressway Authority (MDX). The work will be carried out between State Road (SR) 836 beginning at NW 17 Avenue and continuing through the SR 836/I-395/I-95 (Midtown) Intercha
January 18, 2019 Read time: 2 mins

Planning work is being carried out for a major interstate redesign project in Miami, Florida. The US$802 million project involves the redesign of I-395 and surveying activities are now commencing. The I-395/SR 836/I-95 Project is being carried out in partnership between the 2697 Florida Department of Transportation (FDOT) and the Miami-Dade Expressway Authority (MDX). The work will be carried out between State Road (SR) 836 beginning at NW 17 Avenue and continuing through the SR 836/I-395/I-95 (Midtown) Interchange to the MacArthur Causeway Bridge. Meanwhile the limits on I-95 are from NW 8 Street to NW 29 Street.

The project is due for completion in the third quarter of 2023 and includes building major bridge links, such as the signature bridge over NE2 Avenue and Biscayne Boulevard and a double-decked section of SR 836 over the Miami River.

According to the project partners, this work will deliver key benefits for safety and mobility. Safety will be improved for commuters by reducing weaving movements associated with drivers entering and exiting SR 836 and I-95 at the Midtown Interchange. Safety will also be enhanced for pedestrians under the new I-395 bridges with creation of a contiguous trail from NW 3 Avenue to Biscayne Boulevard, better crosswalks and new bike lanes. Meanwhile mobility will be improved for residents, commuters and tourists by increasing capacity on SR 836, I-95 and I-395. SR 836 will be double-decked to allow for a direct connection between SR 836 and I-395. Mobility in Overtown will also be improved with the connection of NW 2 Avenue under I-395 and improvements to arterial roads.

For more information on companies in this article

Related Content

  • Stantec wins upgrade to Florida SR 91
    July 29, 2019
    Canadian contractor Stantec is to lead design work for a 16km upgrade and widening of State Road 91 in the US state of Florida. Work will turn the section of road through Lake County into price-managed lanes for improved travel reliability, according to the company which will be working for Florida’s Turnpike Enterprise, part of the Florida Department of Transportation. Turnpike Enterprise operates a 740km-system of limited access toll highways Stantec’s design for the project, with a construction cos
  • Texas highway contract
    January 22, 2018
    Michael Baker International has been awarded a US$6.1 million contract by the Texas Department of Transportation (TxDOT). The contract is for Construction Engineering and Inspection (CEI) services for the Lowest Stemmons Freeway project. The Lowest Stemmons project, a 3.7km stretch of Interstate-35E (I-35E), runs from Interstate-30 to north of Oak Lawn Avenue in Dallas. The aim of the project is to reduce congestion, improve mobility and deliver more reliable travel times. The project is also the first for
  • $152 million SC interchange project for Webuild
    February 28, 2025
    Webuild is carrying out a $152 million interchange project in South Carolina.
  • Russia's key highway development project
    February 8, 2012
    One of the largest construction programmes in Europe is being carried out to get a Russian resort ready for the Winter Olympics. Patrick Smith reports