Skip to main content

Miami interstate highway redesign project commencing

Planning work is being carried out for a major interstate redesign project in Miami, Florida. The US$802 million project involves the redesign of I-395 and surveying activities are now commencing. The I-395/SR 836/I-95 Project is being carried out in partnership between the Florida Department of Transportation (FDOT) and the Miami-Dade Expressway Authority (MDX). The work will be carried out between State Road (SR) 836 beginning at NW 17 Avenue and continuing through the SR 836/I-395/I-95 (Midtown) Intercha
January 18, 2019 Read time: 2 mins

Planning work is being carried out for a major interstate redesign project in Miami, Florida. The US$802 million project involves the redesign of I-395 and surveying activities are now commencing. The I-395/SR 836/I-95 Project is being carried out in partnership between the 2697 Florida Department of Transportation (FDOT) and the Miami-Dade Expressway Authority (MDX). The work will be carried out between State Road (SR) 836 beginning at NW 17 Avenue and continuing through the SR 836/I-395/I-95 (Midtown) Interchange to the MacArthur Causeway Bridge. Meanwhile the limits on I-95 are from NW 8 Street to NW 29 Street.

The project is due for completion in the third quarter of 2023 and includes building major bridge links, such as the signature bridge over NE2 Avenue and Biscayne Boulevard and a double-decked section of SR 836 over the Miami River.

According to the project partners, this work will deliver key benefits for safety and mobility. Safety will be improved for commuters by reducing weaving movements associated with drivers entering and exiting SR 836 and I-95 at the Midtown Interchange. Safety will also be enhanced for pedestrians under the new I-395 bridges with creation of a contiguous trail from NW 3 Avenue to Biscayne Boulevard, better crosswalks and new bike lanes. Meanwhile mobility will be improved for residents, commuters and tourists by increasing capacity on SR 836, I-95 and I-395. SR 836 will be double-decked to allow for a direct connection between SR 836 and I-395. Mobility in Overtown will also be improved with the connection of NW 2 Avenue under I-395 and improvements to arterial roads.

For more information on companies in this article

Related Content

  • A new bridge is being built in Florida
    June 16, 2023
    A new bridge spanning the St Johns River is being built in Florida.
  • Major project for Milwaukee
    March 1, 2012
    In the US city of Milwaukee plans are in hand for a major highway upgrade that is expected to cost US$300 million.
  • Major project for Milwaukee
    May 3, 2012
    In the US city of Milwaukee plans are in hand for a major highway upgrade that is expected to cost US$300 million. The upgrade will focus on Interstate 794 where it runs through the centre of Milwaukee, as well as the Hoan Bridge. This three year project is due to start at the end of 2013 and will improve connections with the Port of Milwaukee.
  • Atkins is working on major deals for Texas and Florida
    March 10, 2014
    Atkins is working on major contracts in Texas and Florida for tolling and design and build services respectively. In Texas the Department of Transportation (TxDOT) reselected Atkins as its state-wide prime consultant for toll-plaza planning, development, and implementation. Under the terms of the five-year, $10 million contract, Atkins is providing planning, development, infrastructure design and coordination, and construction oversight services, as well as system installation, integration, and testing serv