Skip to main content

Mexico’s Transistmico transport corridor project earmarked to finish in 3 years

The transport corridor created by the Transistmico project, linking the port of Coatzacoalcos (Veracruz) with Salina Cruz (Oaxaca) in Mexico, should be operational within three years if US$2 billion of investment is secured. Representatives from the API port authority in Coatzacoalcos said that the conditions to develop this scheme are ideal, whilst technical studies will be developed in the short term.
November 22, 2013 Read time: 2 mins
The transport corridor created by the Transistmico project, linking the port of Coatzacoalcos (Veracruz) with Salina Cruz (Oaxaca) in Mexico, should be operational within three years if US$2 billion of investment is secured.

Representatives from the API port authority in Coatzacoalcos said that the conditions to develop this scheme are ideal, whilst technical studies will be developed in the short term.

Supported by the Mexican Government, the Transistmico project is widely seen an alternative to the Panama Canal. Five industrial plants are planned along its 302km length, whilst a second railway line and improvements to motorways will be included in the overall delivery of the project.

The API in Coatzacoalcos is seeking to diversify its operations, whilst it believes that the project should be managed centrally by one person or authority, coordinating efforts of the two APIs and the two regional governments so that nobody has an unfair advantage. Transistmico will not compete with other ports in the country. Around 38.19 million will be used to carry out studies linked to the project, with the government stating that these funds must be used in the first quarter of 2014. A Public-Private Partnership (PPP) model will be employed.

Related Content

  • Mexico’s new Jala-Puerto Vallarta Highway
    August 29, 2017
    Mexico’s highway infrastructure plays a key role in the country’s economy, carrying around 55% of its freight and 98% of its passenger traffic. To meet this demand, the network has 377,660km of roads in all. This is split between the 49,652km federal highway network, the 83,982km of state roads, 169.429km of rural roads and 74,596km of access roads. mHowever, although the federal road network manages to connect a large part of the country's strategic points, some stretches already present problems with satu
  • Road transport must evolve in line with users’ needs
    February 7, 2012
    At its annual plenary meeting held on 25 May 2010, during the 16th IRF World Meeting in Lisbon, the European Road Federation (ERF) elected a new President in the person of Jacobo Díaz Pineda.
  • Road transport must evolve in line with users’ needs
    April 12, 2012
    At its annual plenary meeting held on 25 May 2010, during the 16th IRF World Meeting in Lisbon, the European Road Federation (ERF) elected a new President in the person of Jacobo Díaz Pineda. Mr. Díaz Pineda has been the Director General of the Spanish Road Association (AEC) since September 2006, and is also President of the Ibero-American Road Institute (IVIA). We took advantage of his presence in Lisbon to ask him a few questions about his new responsibilities:
  • Key report calls for 20-year transport infrastructure plan
    March 14, 2012
    A key transport industry report has called for a 20-year transport infrastructure plan, while also highlighting the short-term need for more private sector investment.