Skip to main content

Mega project for Indonesia

The Indonesian Government has handed out contracts for the new Sunda Strait Bridge. Construction of the US$11 billion project is expected to commence in the first quarter of 2014.
March 22, 2012 Read time: 1 min
RSSThe Indonesian Government has handed out contracts for the new Sunda Strait Bridge. Construction of the US$11 billion project is expected to commence in the first quarter of 2014. The preliminary work now starting includes a feasibility study and the first stages of the design process, with specialist consultants having been contracted for this work. The bridge will measure some 29km long and will connect Lampung in Sumatra and Merak in Java, crossing the Sunda Strait as its name suggests. The structure will feature six traffic lanes for cars, buses and trucks as well as twin rail tracks and additional lanes for motorcycles.

Related Content

  • Major bridge widening project going to plan
    May 2, 2012
    When built it was determined that a vital US road/rail bridge would always be widened.
  • Key Indonesia bridge project proves unfeasible
    June 8, 2015
    Proposals to construct the Sunda Strait Bridge are not feasible, according to the Ministry of Energy and Mineral Resources of Indonesia. Safety risks from earthquakes, tsunami, high tides and extreme weather conditions make the project impractical. A US$75.46 million feasibility study was carried out for the project. This pointed out that the bridge is at a high risk from earthquakes and tsunamis due to its vicinity to the Anak Krakatoa volcano.
  • Indonesia bridge plan study
    April 26, 2012
    A two-year US$150million feasibility study has begun into plans to build a 33km bridge in Indonesia. Project planner Wiratman & Associates will co-operate with Streto di Messina of Italy during the study of the US$291.2million Sunda Strait bridge project, managed and funded by the Banten-Lampung consortium and Bangungraha Sejahtera Mulia.
  • Indonesia bridge project plans revived
    August 9, 2017
    In Indonesia plans are being drawn up for a bridge to connect Bintan Isand with Batam Island. In all the bridge connection would measure 7km long and be built in three sections: Batam - Pulau Tanjung Sauh; Pulau Tanjung Sauh - Pulau Buau; Pulau Buau – Bintan. The bridge project was proposed previously in 2005 but stalled a few years later, with financing being an issue at the time. When the work was costed back in 2009 it had a pricetag of US$350 million. However, the work will be somewhat more costly to co