Skip to main content

Many bidders for key Polish dual carriageway works

Great interest has been shown in tenders advertised by GDDKiA to build three sections of the S3 dual carriageway in Poland. A total of 18 bids were received from firms and consortia for the first section, which measures 14.4km and extends from the Kazmierzow junction to Lubin North. The other two sections, from the Lubin North junction to the Lubin South junction (11.3km) and from Lubin South to the Legnica II junction (22.6km), both attracted similar bidders to the first tender.
October 15, 2013 Read time: 1 min
Great interest has been shown in tenders advertised by 1361 GDDKiA to build three sections of the S3 dual carriageway in Poland. A total of 18 bids were received from firms and consortia for the first section, which measures 14.4km and extends from the Kazmierzow junction to Lubin North. The other two sections, from the Lubin North junction to the Lubin South junction (11.3km) and from Lubin South to the Legnica II junction (22.6km), both attracted similar bidders to the first tender.

For more information on companies in this article

Related Content

  • Strabag wins Polish road contract
    September 17, 2018
    Austrian contractor Strabag has won a stake in a design and build road contract in Poland. The project is worth a total of €133 million and involves building a section of highway carrying three lanes in either direction. The firm will work on the project to build another stretch of the A1 highway in Poland. The 17km long Section C begins at the Kamieńsk junction and ends at Radomsko, where the construction of a motorway interchange forms part of the order.
  • Austria's first PPP project takes shape
    July 31, 2012
    North of the Austrian capital Vienna, one of the region's biggest transport infrastructure projects for decades is currently under construction, the A5 Nordautobahn. This will give the Greater Vienna region its first-ever high-capacity link to the Czech motorway and arterial road network, greatly easing congestion on the old main road. In the first phase of construction, 22.7km of motorway are to be built. Work on the second section, all the way through to the Czech border, is to start in 2010. The A5 Norda
  • Polish projects provide transport plan
    September 19, 2014
    Poland is planning to enter seven transport projects to the Connecting Europe Programme, with these having a combined value close to €2.86 billion. Among the planned projects are the S61 express road between the Lithuanian border and Augustow. Meanwhile STRABAG and Budimex have formed a consortium that will construct a 41km stretch of the A4 highway in Poland. The section of the route runs from Rzeszów to Jarosław, in south-eastern Poland. The project is expected to take 14 months to complete and the contra
  • Romania’s DEx12 Craiova-Pitesti on target
    November 17, 2021
    The DEx12, costing nearly €1 billion, will include 10 junctions and 75 bridges and passages.