Skip to main content

Many bidders for key Polish dual carriageway works

Great interest has been shown in tenders advertised by GDDKiA to build three sections of the S3 dual carriageway in Poland. A total of 18 bids were received from firms and consortia for the first section, which measures 14.4km and extends from the Kazmierzow junction to Lubin North. The other two sections, from the Lubin North junction to the Lubin South junction (11.3km) and from Lubin South to the Legnica II junction (22.6km), both attracted similar bidders to the first tender.
October 15, 2013 Read time: 1 min
Great interest has been shown in tenders advertised by 1361 GDDKiA to build three sections of the S3 dual carriageway in Poland. A total of 18 bids were received from firms and consortia for the first section, which measures 14.4km and extends from the Kazmierzow junction to Lubin North. The other two sections, from the Lubin North junction to the Lubin South junction (11.3km) and from Lubin South to the Legnica II junction (22.6km), both attracted similar bidders to the first tender.

For more information on companies in this article

Related Content

  • Stonehenge tunnel preferred bidder announced
    May 27, 2022
    The preferred bidder has been announced for the UK’s Stonehenge tunnel.
  • Shortlist set for Norway’s Sotra PPP project
    May 21, 2020
    Sotra Link, Itias and Vis Sotra are vying for the $1.15 billion deal.
  • US$7.6bn spent on new Polish roads
    April 26, 2012
    PLN 26.4billion (US$7.6billion) was spent on new roads in Poland in 2011, according to a report prepared by the Polish General Directorate for National Roads and Motorways (GDDKiA). The investment resulted in the construction of 205.5km of motorways and 62.2km of dual carriageways.
  • Poland bidders angry over Astaldi win for Warsaw Ring Road work
    June 18, 2015
    Four groups that made bids for building the southern section of the Warsaw Ring Road have filed complaints about how the national road authority GDDKiA chose Astaldi as the winner. Companies appealing to the National Board of Appeal (KIO) are Impresa Pizzarotti, Porr Polska, Salini Polska and IDS-BUD. The offer made by Italian company Astaldi was at least 25% less than the estimated €391 million cost of the project, according to Polish media reports. World Highways reported in February that Astaldi