Skip to main content

Many bidders for key Polish dual carriageway works

Great interest has been shown in tenders advertised by GDDKiA to build three sections of the S3 dual carriageway in Poland. A total of 18 bids were received from firms and consortia for the first section, which measures 14.4km and extends from the Kazmierzow junction to Lubin North. The other two sections, from the Lubin North junction to the Lubin South junction (11.3km) and from Lubin South to the Legnica II junction (22.6km), both attracted similar bidders to the first tender.
October 15, 2013 Read time: 1 min
Great interest has been shown in tenders advertised by 1361 GDDKiA to build three sections of the S3 dual carriageway in Poland. A total of 18 bids were received from firms and consortia for the first section, which measures 14.4km and extends from the Kazmierzow junction to Lubin North. The other two sections, from the Lubin North junction to the Lubin South junction (11.3km) and from Lubin South to the Legnica II junction (22.6km), both attracted similar bidders to the first tender.

For more information on companies in this article

Related Content

  • Consortia compete for Colombian construction and concession contract
    June 4, 2014
    Colombia's US$561 million Perimetral de Oriente de Cundinamarca4G highway concession package has received bids from four different consortia. Business News Amercas reports that this is the highest number of bidders that a 4G highway concession has received since the country’s national infrastructure agency, ANI, started receiving bids in April for its first wave of nine highway concessions. There were comparatively few bidders for the first three projects so ANI made a number of changes, including revising
  • JCB excavators JS220 and 370 work close to home
    May 14, 2018
    A fleet of JCB excavators is playing a major role in a road construction project only metres from the factory where they were built. Derbyshire-based earthmoving specialist JC Balls is working for a Carillion-Tarmac joint venture on the A50 Growth Corridor Project A. The contract is part of the National Infrastructure Plan and consists of constructing a grade-separated junction on the A50 dual carriageway to the west of the town of Uttoxeter. Project managed by Amey, the scheme is creating three new
  • Polaqua signs S6 dual carriageway deal and Tri-City contract
    April 9, 2018
    Polish contractor Polaqua has signed a deal worth €193 million to design and build a 20km section of S6 dual carriageway. Completion is scheduled for mid-2021. Polaqua will also build a 3km section as part of the expansion of the ring road around the Tri-City area in northern Poland. Tri-City incorporates the three cities in Pomerania - Gdańsk, Gdynia and Sopot, as well as surrounding minor towns. They are situated along the coast of Gdańsk Bay on the Baltic Sea. The regional population is more than 1
  • Duna Aszfalt wins M44 dualing between Bekescsaba and Kondoros
    January 10, 2018
    Hungarian contractor Duna Aszfalt has won the tender for building a section of the M44 dual carriageway between Bekescsaba and Kondoros. The €133 million deal is for 18km of the M44. The other bidders were Strabag Altalanos Epito, Colas Hungaria with Colas Kozlekedesepito and a consortium including Pannon-Doprastav, Subterra-Raab and Domper. Békéscsaba is near the Romanian border with the M5 interchange at Kecskemét. Meanwhile, under the Rural Development Programme, the government said it will boost