Skip to main content

Malaysian bridge project in Sarawak

Work is now starting on a new bridge in Sarawak, Malaysia and is expected to take three years to complete.
December 4, 2019 Read time: 1 min

The two lane Rambungan Bridge is costing US$23.75 million to build and is one of nine bridges being constructed in Sarawak to link with the coastal road system. The 3491 Malaysian Government has sourced a series of loans to fund the work from the Development Bank of Sarawak (Debos). The new Rambungan Bridge is being built by a joint venture comprised of Precious Credence and Ghezhouba. The consultancy firms 1523 Opus Consultant and Jurutera Minsar Consult are also involved with the project.

For more information on companies in this article

Related Content

  • Bihar crossing for Ganges River
    November 16, 2016
    A loan facility from the Asian Development Bank (ADB) will help fund work on the project to construct a new bridge over the River Ganges in India’s Bihar State. Because of the width of the river at this point, the bridge will be close to 10km in length, making it the longest in India. The new bridge will improve transport connections between the north and south of the state and the project is expected to cost around US$500 million. Building the bridge will help develop transport and trade in the area, as we
  • Major Malaysian bridge project planned
    February 3, 2016
    Malaysia’s Federal Government and Sarawak State Government have agreed to construct a bridge in Sri Aman. The new bridge will span the Sungai Batang Lupar waterway in Sri Aman. The work will be managed and funded on a 50-50 basis by Malaysia’s Federal Government and the Sarawak State Government. In addition, construction work on the Pan-Borneo Highway is now underway. This major project is expected to cost around US$3.95 billion and will improve transport between Malaysia and its neighbours, helping boost e
  • Funds agreed, further funds sought for Paraguay road and bridge projects
    May 13, 2014
    Paraguay's Ministry of Public Works and Communications (MOPC) has requested a US$289.45 million donation from the Mercosur Structural Convergence Fund (Focem) for the second stage of the Costanera road project (Costanera II) and a second bridge connecting the country to Brazil. Of this total, around $117.44 million will be allocated to works on Costanera II. This is higher than the initial estimate of $100 million, with 60% covered by Focem and 40% financed by a local counterpart. The bridge, which will req
  • Float positioning for Bandra Worli Bridges
    May 29, 2024
    In Mumbai, India, two steel bridges have been barged to site and then lifted into position as part of the Mumbai Coastal Road-Bandra Worli Sea Link project.