Skip to main content

Malaysian bridge project revived

The Jambatan Bridge project in Malaysia now looks to be revived. The project to construct the 1.4km bridge was first proposed in 2003 but progress then stalled. However new proposals have been put forward for the project, which would replace the existing Johor Causeway. The new link would provide an improved transport connection between Malaysia and Singapore.
October 19, 2018 Read time: 1 min

The Jambatan Bridge project in Malaysia now looks to be revived. The project to construct the 1.4km bridge was first proposed in 2003 but progress then stalled. However new proposals have been put forward for the project, which would replace the existing Johor Causeway. The new link would provide an improved transport connection between Malaysia and Singapore.

Related Content

  • New road link to Malaysian oil facility
    July 23, 2014
    A series of important new road links in Malaysia are now being built in a project worth some US$107.7 million. The project is being carried out by local contractor WCT Holdings. The deal was awarded to the contractor by the oil company Petronas Refinery and Petrochemical Corp (Petronas). The contract involves the construction of permanent and construction access roads for the Refinery and Petrochemical Integrated Development (RAPID) complex that Petronas is building in Malaysia’s Johor State.
  • Indonesian tunnel project proposed
    February 2, 2022
    An Indonesian tunnel project is being proposed.
  • A new tolled highway brings change for Austin, Texas
    February 10, 2020
    A new highway section in Austin, Texas marks a major departure for the southern US city
  • Mini-bridge aids Forth repairs
    July 17, 2012
    An engineering "first" means that rehabilitation work on a vital Scottish bridge built over 40 years ago can be carried out smoothly A new report to the Forth Estuary Transport Authority (FETA) in Scotland recommends appointing Balfour Beatty Civil Engineering of Edinburgh as 'preferred bidder' to carry out the scheduled replacement of the bridge's main expansion joints in 2009. However, the report to the bridge authority says the tender price of £13.7 million (US$21.3 million) is some £5 million ($7.8 mill