Skip to main content

Malaysia tunnel project moving ahead?

Plans are being made for a new link to connect Malaysia’s Penang Island with the Malaysian mainland. The Consortium Zenith Construction (CZC) won the tender process for the US$1.56 billion Penang Roads and Tunnels project, an integrated infrastructure plan that includes the new undersea tunnel. There are suggestions that a bridge would be a feasible alternative, although the tunnel link looks most likely for the project. The feasibility study for the tunnel should be complete in September 2018. Should the
July 11, 2018 Read time: 2 mins

Plans are being made for a new link to connect Malaysia’s Penang Island with the Malaysian mainland. The Consortium Zenith Construction (CZC) won the tender process for the US$1.56 billion Penang Roads and Tunnels project, an integrated infrastructure plan that includes the new undersea tunnel.

There are suggestions that a bridge would be a feasible alternative, although the tunnel link looks most likely for the project. The feasibility study for the tunnel should be complete in September 2018. Should the tunnel project get the go ahead, it would be ready to use by 2023 if the intended schedule is met.

This will be the largest privately funded public works project in Penang and is intended to help tackle congestion and reduce delays for drivers. The project is being managed jointly by CZC and the Penang State Government. And the project will also allow for the addition of the Penang LRT infrastructure in the future.

Related Content

  • New Czech highway connection planned
    February 4, 2016
    An important new highway connection is being planned in the Czech Republic. The road will provide a link between the D8 Teplice highway and the Chomutov expressway. The Czech Transport Ministry has given its approval for an allocation of €166.55 million to the country’s Central Bohemian region for the construction work on the link road. However the project will still have to be approved by the Czech Government. Should the work go ahead, the project will be split into three phases, with construction of the f
  • Loan for major US tunnel project
    October 4, 2021
    A loan facility will help finance a major US tunnel project.
  • Newfoundland boosts repair spend for 2023-24
    April 24, 2023
    The eastern Canadian province will spend an “unprecedented” US$167 million.
  • Sweco lands lead consultancy on Scotland’s Cross Tay Link project
    August 17, 2017
    Engineering, environment and design consultancy Sweco UK has won the contract as the lead consultant on the Cross Tay Link Road project near Perth, Scotland. Sweco UK was appointed by Perth & Kinross Council under a €3.86 million contract as parat of the on the project whose value is around €124.5 million. Phase two of four of the Perth Transport Futures Project includes the realignment of a section of the A9 trunk road and provision of a bridge across the River Tay – the third across the river - and over t