Skip to main content

Malaysia tunnel project moving ahead?

Plans are being made for a new link to connect Malaysia’s Penang Island with the Malaysian mainland. The Consortium Zenith Construction (CZC) won the tender process for the US$1.56 billion Penang Roads and Tunnels project, an integrated infrastructure plan that includes the new undersea tunnel. There are suggestions that a bridge would be a feasible alternative, although the tunnel link looks most likely for the project. The feasibility study for the tunnel should be complete in September 2018. Should the
July 11, 2018 Read time: 2 mins

Plans are being made for a new link to connect Malaysia’s Penang Island with the Malaysian mainland. The Consortium Zenith Construction (CZC) won the tender process for the US$1.56 billion Penang Roads and Tunnels project, an integrated infrastructure plan that includes the new undersea tunnel.

There are suggestions that a bridge would be a feasible alternative, although the tunnel link looks most likely for the project. The feasibility study for the tunnel should be complete in September 2018. Should the tunnel project get the go ahead, it would be ready to use by 2023 if the intended schedule is met.

This will be the largest privately funded public works project in Penang and is intended to help tackle congestion and reduce delays for drivers. The project is being managed jointly by CZC and the Penang State Government. And the project will also allow for the addition of the Penang LRT infrastructure in the future.

Related Content

  • Hanoi’s $1.9 billion three new bridges
    March 10, 2025
    $1.9 billion is being spent for Hanoi’s three new bridges
  • Malaysia raised expressway contracts awarded
    August 22, 2016
    Contracts are now being awarded for a major new expressway project in Malaysia. The contracts relate to the project to construct the Sungai Besi-Ulu Kelang Elevated Expressway (SUKE). Malaysian firm Gabungan AQRS is now handling a US$126.4 million subcontract for the project that involves building a bridge section. This package of works should take two years to complete with the work scheduled to finish by the end of 2018.
  • Chinese Government taking steps to reduce vehicle exhaust pollution
    November 15, 2013
    As a modern bustling megacity, Beijing is undergoing a fast growth rate and the country’s economic development has seen vehicle numbers increase rapidly, both in its capital and in other major cities. However, the recent pollution problems that hit several of China’s major cities, including capital Beijing, have underscored the need to reduce vehicle exhaust emissions in the country. The Chinese Government has recognised the need to address the problems of air pollution and congestion and Beijing in particu
  • CONEXPO-CON/AGG 2017 will help you imagine what’s next
    March 15, 2017
    What sort of key trends will be on show, and how will these new technologies shape the sector over the coming years? Alan Dron interviewed Al Cervero, the AEM senior vice-president for construction, utility and mining on how the show will reveal what is coming. The theme for this year’s event is “Imagine what’s next”, a particularly appropriate title in view of the changes in both technology and the environment in which that technology will be used.