Skip to main content

Malaysia mega tunnel project

A massive tunnel project is set to commence in Malaysia shortly. This impressive project includes the construction of three expressways and an undersea tunnel and is intended to link Penang island to the mainland. The work is set to commence on the 15th June 2016, with the first stage being the construction of the Air Itam-Tun Dr Lim Chong Eu Expressway bypass. The main contractor for the project is Consortium Zenith BUCG (CZBUCG) and its partner for the undersea tunnel is China Railway Construction. The pr
March 9, 2016 Read time: 2 mins
A massive tunnel project is set to commence in Malaysia shortly. This impressive project includes the construction of three expressways and an undersea tunnel and is intended to link Penang island to the mainland. The work is set to commence on the 15th June 2016, with the first stage being the construction of the Air Itam-Tun Dr Lim Chong Eu Expressway bypass. The main contractor for the project is Consortium Zenith BUCG (CZBUCG) and its partner for the undersea tunnel is China Railway Construction. The project is costing around US$1.55 billion in all.

The road link connecting Jalan Tanjung Bungah to Teluk Bahang will run from mid-way along the Air Itam-Tun Dr Lim Chong Eu bypass. Work on the third road to Tun Dr Lim Chong Eu from Gurney Drive is set to start construction after the first two reach completion. Construction of the undersea tunnel will commence either in 2020 or 2021.

Related Content

  • Malaysia hopes Pan Borneo Highway will boost Borneo’s economy
    July 2, 2015
    Malaysian prime minister Datuk Seri Najib Tun Razak said the toll-free Pan Borneo highway should trigger economic growth in Sarawak state which has been held back by the lack of a good road network. Razak was speaking at the signing of a memorandum of understanding between federal government officials, officials from the state of Sarawak and infrastructure company Lebuhraya Borneo Utara Sdn. The event took place in the federal administrative capital Putrajaya, around 25km from the capital city Kuala L
  • What lies beneath Down Under
    January 11, 2021
    The third and final construction stage on Sydney’s WestConnex project has begun, including the underground Rozelle Interchange – with a lot of help from Komatsu
  • Malaysian bridge link planned
    December 7, 2020
    A major Malaysian bridge link is being planned.
  • Davao City tunnel work accelerated
    November 18, 2022
    The twin-tube 2.3km-long tunnel will be the longest in the Philippines and is being constructed by Filipino and Japanese engineers.