Skip to main content

Malaysia elevated highway project due to commence

Work will commence on Malaysia’s new elevated highway construction at the beginning of September 2019. The 5.7km highway stretch will feature two lanes in either direction and will be constructed in Malaysia’s Penang State. It will provide a link between the Tun Dr Lim Chong Eu Expressway and Air Itam, with 70% of the route being elevated. The new link will feature three major interchanges and should take three years to construct.
April 30, 2019 Read time: 1 min

Work will commence on Malaysia’s new elevated highway construction at the beginning of September 2019. The 5.7km highway stretch will feature two lanes in either direction and will be constructed in Malaysia’s Penang State. It will provide a link between the Tun Dr Lim Chong Eu Expressway and Air Itam, with 70% of the route being elevated. The new link will feature three major interchanges and should take three years to construct.

Related Content

  • Romanian highway works commencing
    July 15, 2022
    Highway works are commencing in Romania.
  • Highway work boost in North Africa
    August 21, 2012
    North Africa is seeing construction business return - Mike Woof reports After a troubled period, stability looks to be returning to North African nations, which can only be good for the road construction sector. First Tunisia, then Egypt and finally Libya saw tumultuous revolts against the previous autocratic (and in one case at least, despotic) rulers. All three nations are now benefiting from a return to stability, with economic growth also improving once more.
  • New highway projects planned for Malaysia
    December 13, 2013
    Major highway projects are being planned for Malaysia, to boost transport connectivity. A new toll road has been proposed in Negri Sembilan's Senawang, to connect the Kajang-Seremban Expressway (Lekas) with the North South Expressway (NSE). This has been put forward by the North South Expressway (NSE) operator, PLUS Expressway. The planned toll road would be shorter than the Lekas-NSE stretch by some 3-5km and would cut journey times by bypassing 11 traffic lights between Lekas and the NSE. The aim of the p
  • €900 million German Autobahn project
    July 21, 2025
    Planning is underway for a €900 million German Autobahn project.