Skip to main content

Malaysia bridge feasibility study to show project viability

The feasibility study for a key bridge link in Malaysia will reveal the viability of the project. The study for the Labuan-Menumbok Bridge Link in Malaysia is thought to have a contract value of around US$3.6 million. A number of consultancies have tendered for the study deal.
January 23, 2018 Read time: 1 min

The feasibility study for a key bridge link in Malaysia will reveal the viability of the project. The study for the Labuan-Menumbok Bridge Link in Malaysia is thought to have a contract value of around US$3.6 million. A number of consultancies have tendered for the study deal.

Related Content

  • Malaysia road tender opening
    November 29, 2016
    The tender process for a key road project is commencing in Malaysia. The tender is for building the KPC Port Link Road as well as a number of other associated works, which will be carried out in Bandar Pelabuhan Kuantan, Pahang. The project will form part of plans being set out by Malaysia’s East Coast Economic Region Development Council (ECERDC). This new road link will imrpove connectivity to the port, allowing for more efficient transportation of goods by road, to and from the facility. To be considered
  • A key bridge project in Bangladesh will be financed by loans from Malaysia
    April 11, 2012
    Work on a key bridge link in Bangladesh is to be financed by a loan provided by Malaysia. The Bangladesh Government and Malaysian Government have signed a memorandum of understanding for the construction of Padma bridge.
  • Morocco infrastructure study opening for tender
    April 21, 2016
    Morocco is planning a new infrastructure programme. The country’s Ministry of Equipment, Transport and Logistics is introducing a new tender scheme for a study that will be used to establish the national road infrastructure scheme (Snir) by 2035.
  • Philippines bridge project receiving Chinese assistance?
    November 16, 2016
    Plans are moving forward with regard to the Iloilo-Guimaras-Negros Bridge in the Philippines. Building the 13.2km bridge is expected to cost up to US$457 million and take three years to be completed once the construction gets underway. The bridge will be built in the Visayas Region of the Philippines and would link a number of islands, replacing the ferry services in use at present. Chinese expertise may be employed to help design and construct the link while South Korean sources could deliver a portion of