Skip to main content

Malaysia bridge construction project now commencing

Construction work is commencing on a key contract in Malaysia to build a new bridge. The US$106.4 million project is being handled by the contractor Naza EC and is for the construction of the 1.5km long Bagan Datuk Bridge, as well as an 8.7km long link road. The work is intended to improve transport connections between Malaysia’s Bagan Datuk, Perak Tengah, and Manjung districts. Once complete, the new link will reduce journey times for drivers from one hour at present to just 15 minutes.
November 8, 2017 Read time: 1 min

Construction work is commencing on a key contract in Malaysia to build a new bridge. The US$106.4 million project is being handled by the contractor Naza EC and is for the construction of the 1.5km long Bagan Datuk Bridge, as well as an 8.7km long link road. The work is intended to improve transport connections between Malaysia’s Bagan Datuk, Perak Tengah, and Manjung districts. Once complete, the new link will reduce journey times for drivers from one hour at present to just 15 minutes.

Related Content

  • Framework solutions speed bridge construction
    February 24, 2012
    Framework plays a key role in construction of bridges and other major infrastructure works – Mike Woof writes Speeding construction processes can help reduce costs considerably and the latest formwork solutions can provide significant benefits in this regard. In many projects the use of standardized and modular formwork solutions can play a key role, reducing the planning and systems required for bridge building work.
  • €108 million Italian port access upgrade project
    December 1, 2023
    Besix and Donati have been awarded a €108 million Italian port access upgrade project.
  • Nepal-India bridge project planned
    September 4, 2017
    Plans are being drawn up for a new bridge connection that will link Nepal with India. The bridge will span the Mechi River and will connect India’s Panitanki Bypass with Nepal’s East-West Highway. The project has been the subject of discussions between the two countries and is now moving forward following the successful conclusions of talks. The aim of the project is to boost trade and transport between the two nations. Construction of the 1.5km bridge link is expected to cost US$24.8 million
  • Chilean bridge project to Chiloe Island delayed
    October 31, 2018
    Delays to the project to construct Chile’s Chacao Bridge mean that an additional two years may be required for the work. The work is now being carried out solely by a consortium, Consorcio Puente Chacao, headed by the South Korean contractor Hyundai.