Skip to main content

Malaysia actions Pan Borneo highway projects

Malaysia is pushing ahead with a series of construction projects that will form sections of the Pan Borneo Highway in Sarawak. Work will go ahead on eight sections of this important route and this will form phase one of the project, with the cost anticipated as some US$3.05 billion. The eight packages consist of the 95km stretch from Sematan to Sungai Moyan Bridge, an 89km stretch connecting Pantu Interchange with Batang Skrang and the 80km section from Sungai Tangap Interchange to the Pujut Link Road. They
December 20, 2016 Read time: 2 mins
RSSMalaysia is pushing ahead with a series of construction projects that will form sections of the Pan Borneo Highway in Sarawak. Work will go ahead on eight sections of this important route and this will form phase one of the project, with the cost anticipated as some US$3.05 billion. The eight packages consist of the 95km stretch from Sematan to Sungai Moyan Bridge, an 89km stretch connecting Pantu Interchange with Batang Skrang and the 80km section from Sungai Tangap Interchange to the Pujut Link Road. They also include the 77km Bakun Interchange to Sungai Tangap section, the 68km section from Batang Skrang to Sungai Awik Bridge, the 65km section from Sungai Arip Bridge to Bintulu Interchange, the 64km Sungai Kua Bridge to Sungai Arip Bridge stretch and the 64km Sungai Awik Bridge to Bintangor Interchange section. A further three stretches of the Sarawak route have yet to be allotted and will have an estimated total cost of $976 million. In all the Sarawak portion of the project will cost $4.026 billion and will measure 1,089km long, with its completion expected in 2021.

Related Content

  • Uganda and Congo sign agreement
    June 14, 2021
    Uganda and Congo have signed a road improvement agreement.
  • Vietnam’s US$1.6 billion key road projects
    October 7, 2024
    Vietnam is investing US$1.6 billion for four key road projects.
  • Machine control technology shortens road contract
    May 28, 2013
    The use of sophisticated machine control technology has helped halve the schedule required for a road contract – Jeff Winke. By using the latest machine control systems on the equipment fleet, a US contractor has managed to halve worker hours, machine time and overall costs. “We chopped 50% off the contract schedule,” said Jim Swenson, licensed professional land surveyor for Oregon Mainline Paving based in McMinnville, Oregon. “The project was completed a year ahead of the two-year schedule,” he explained.
  • ASEAN Investors’ Brief: A Dynamic hub for Road Programs
    August 22, 2016
    If the countries of the Association of Southeast Asian Nations (ASEAN) formed a single economic entity, they would represent the 7th largest economy in the world, with an expectation to be the 4th largest by 2050 on current growth patterns. It is a region with much unrealised potential and favourable demographic trends. It also lies at the heart of several regional trade initiatives that will significantly boost infrastructure investments in the region, such as China’s 'One Belt, One Road' programme