Skip to main content

Major US interchange project underway

Work is starting in the US on a US$356 million interchange project that will connect I-95, I-91 and Route 34 Interchange in New Haven.
February 14, 2012 Read time: 2 mins
Work is starting in the US on a US$356 million interchange project that will connect I-95, I-91 and Route 34 Interchange in New Haven. The US 2410 Federal Highway Administration (FHWA) is providing funding for this project, the last major phase of the I-95 New Haven Harbour Crossing Corridor Improvement Programme. "These I-95 upgrades will cut the congestion that slows down the movement of goods and people in this critical corridor," said US Transportation Secretary Ray LaHood. The project involves rebuilding the interchange to accommodate the new 10 lane Pearl Harbour Memorial Bridge, or Q Bridge, currently under construction. The new bridge will be the first of its kind in the United States combining the characteristics of two different types of bridges. It will combine the characteristics of the concrete box girder bridge (concrete beams in the shape of a box as support) and the cable-stayed bridge (cables attached to piers as support). The interchange project, due for completion in 2016, extends 1.6km along I-95 from Interchange 46 to approximately East Street. The reconstruction will eliminate left-lane exit and entrance ramps to improve safety and will result in the replacement of 21 bridges. The project will add lanes on I-95 and lane connections to I-91 to reduce bottlenecks in the area. The project will help tackle congestion, boosting safety and reducing travel times. The larger New Haven corridor was originally designed and built in the 1950s for a traffic volume of 40,000 vehicles/day. It now accommodates close to 140,000 vehicles/day. The I-95 New Haven Harbour Crossing Corridor Improvement Programme, estimated at $2.2 billion, including the $356 million interchange, consists of 12 contracts for operational and safety improvements on approximately 11.5km of I-95 in New Haven, East Haven and Branford. It extends from Interchange 46 to Interchange 54 on I-95.

For more information on companies in this article

Related Content

  • Modern formwork systems - fast, flexible, safe
    February 21, 2012
    Speed of erection, safety, cost-efficiency and flexibility are among the attributes of modern formwork systems. Modern formwork and scaffolding systems are attractive in particular for their speed of erection, safety, cost-efficiency and flexibility.
  • Innovative, flexible bridge formwork systems
    February 14, 2012
    Innovative formwork systems have been used to construct a variety of bridge structures. Patrick Smith reports. As part of the work on Germany's new A4 autobahn near Eisenach, the contracting joint venture awarded the formwork contract for two of the three viaducts to Doka. What makes this assignment so special to the company is that although the two steel composite bridges each have very different cross-sections, the JV is using the same overslung composite forming carriage to pour the carriageway slabs of
  • Major project to construct landmark Bay Bridge in California
    October 31, 2012
    Iconic California crossing will offer seismic safety – Adrian Greeman reports A unique single-span single-tower suspension bridge is the iconic centrepiece of a dramatic renewal of the eastern Bay Bridge in California, crossing from San Francisco to Oakland. Tourists in San Francisco sometimes mix up their bridges, identifying as the famous Golden Gate, the double suspension bridge which runs across the wide San Francisco Bay. These serially linked bridges in fact form the Bay Bridge east to Oakland whereas
  • Concern over the state of US bridges
    April 1, 2019
    Bridge condition is a serious concern in the US, according to a new report from American Road & Transportation Builders Association (ARTBA).