Skip to main content

Major US interchange project underway

Work is starting in the US on a US$356 million interchange project that will connect I-95, I-91 and Route 34 Interchange in New Haven.
February 14, 2012 Read time: 2 mins
Work is starting in the US on a US$356 million interchange project that will connect I-95, I-91 and Route 34 Interchange in New Haven. The US 2410 Federal Highway Administration (FHWA) is providing funding for this project, the last major phase of the I-95 New Haven Harbour Crossing Corridor Improvement Programme. "These I-95 upgrades will cut the congestion that slows down the movement of goods and people in this critical corridor," said US Transportation Secretary Ray LaHood. The project involves rebuilding the interchange to accommodate the new 10 lane Pearl Harbour Memorial Bridge, or Q Bridge, currently under construction. The new bridge will be the first of its kind in the United States combining the characteristics of two different types of bridges. It will combine the characteristics of the concrete box girder bridge (concrete beams in the shape of a box as support) and the cable-stayed bridge (cables attached to piers as support). The interchange project, due for completion in 2016, extends 1.6km along I-95 from Interchange 46 to approximately East Street. The reconstruction will eliminate left-lane exit and entrance ramps to improve safety and will result in the replacement of 21 bridges. The project will add lanes on I-95 and lane connections to I-91 to reduce bottlenecks in the area. The project will help tackle congestion, boosting safety and reducing travel times. The larger New Haven corridor was originally designed and built in the 1950s for a traffic volume of 40,000 vehicles/day. It now accommodates close to 140,000 vehicles/day. The I-95 New Haven Harbour Crossing Corridor Improvement Programme, estimated at $2.2 billion, including the $356 million interchange, consists of 12 contracts for operational and safety improvements on approximately 11.5km of I-95 in New Haven, East Haven and Branford. It extends from Interchange 46 to Interchange 54 on I-95.

For more information on companies in this article

Related Content

  • Germany to cut red tape for bridge construction up to 2027
    October 5, 2017
    The German federal government has set aside €4.5 billion for refurbishment of 400 bridges in the state of North Rhine-Westphalia up to 2027. Hendrik Wüst, North Rhine-Westphalia transport minister, made the announcement which included around €200 million for road maintenance. The Federal German government also plans to fast-track planning for infrastructure projects. Bonuses to contractors for improved performance to reduce down-time on construction sites as well as the possibily of a six-day working
  • Doka delivers cantilevering for super-slim piers at Lahntal Bridge
    October 21, 2016
    Doka’s formwork expertise is currently in demand during the construction of one of the busiest motorway viaducts in Germany. The 400m six-lane Lahntal Bridge in Limburg dates from the early 1960s. Every day about 100,000 vehicles cross the bridge that spans the valley of the River Lahn. But traffic loads have increased sharply, so a new bridge is being built sited just a few metres west of the old viaduct. The new Lahntal viaduct will measure a massive 43.5m in width, enabling eight lanes plus hard shoul
  • Giving credence for Clearwater revival
    October 29, 2018
    The Minnesota Highway 24 Bridge spanning the Mississippi River at Clearwater is not a major structure. However, it does play a key role as the 376.4m-long bridge links US Highway 10 and Interstate 94. These routes run parallel on opposite sides of the Mississippi River and connect St Cloud to Minneapolis. There was a need to replace the old bridge, built in the 1950s, as it has been designated functionally obsolete, while it featured a restricted maximum load of 36.3tonnes. The price tag to demolish and
  • Germany's advanced bridge construction
    February 24, 2012
    The A98 single-lane motorway in Germany is being extended by a second pair of lanes. Work began in 2007 and required building a second bridge at Rheinfelden in the south-west of the country, parallel to the existing bridge, and identical in design and construction.