Skip to main content

Major US interchange project underway

Work is starting in the US on a US$356 million interchange project that will connect I-95, I-91 and Route 34 Interchange in New Haven.
February 14, 2012 Read time: 2 mins
Work is starting in the US on a US$356 million interchange project that will connect I-95, I-91 and Route 34 Interchange in New Haven. The US 2410 Federal Highway Administration (FHWA) is providing funding for this project, the last major phase of the I-95 New Haven Harbour Crossing Corridor Improvement Programme. "These I-95 upgrades will cut the congestion that slows down the movement of goods and people in this critical corridor," said US Transportation Secretary Ray LaHood. The project involves rebuilding the interchange to accommodate the new 10 lane Pearl Harbour Memorial Bridge, or Q Bridge, currently under construction. The new bridge will be the first of its kind in the United States combining the characteristics of two different types of bridges. It will combine the characteristics of the concrete box girder bridge (concrete beams in the shape of a box as support) and the cable-stayed bridge (cables attached to piers as support). The interchange project, due for completion in 2016, extends 1.6km along I-95 from Interchange 46 to approximately East Street. The reconstruction will eliminate left-lane exit and entrance ramps to improve safety and will result in the replacement of 21 bridges. The project will add lanes on I-95 and lane connections to I-91 to reduce bottlenecks in the area. The project will help tackle congestion, boosting safety and reducing travel times. The larger New Haven corridor was originally designed and built in the 1950s for a traffic volume of 40,000 vehicles/day. It now accommodates close to 140,000 vehicles/day. The I-95 New Haven Harbour Crossing Corridor Improvement Programme, estimated at $2.2 billion, including the $356 million interchange, consists of 12 contracts for operational and safety improvements on approximately 11.5km of I-95 in New Haven, East Haven and Branford. It extends from Interchange 46 to Interchange 54 on I-95.

For more information on companies in this article

Related Content

  • First stay cable installed on UK’s Mersey Gateway bridge
    October 31, 2016
    The first stay cable, 52m long, connecting the Mersey Gateway south pylon to the main bridge deck, has been installed on the Mersey Gateway Project.
  • Qatar starts work on the state’s longest cable stayed bridge
    April 23, 2019
    Qatar has started construction of a 1.2km cable-stayed bridge that will be the longest in the Gulf state. The bridge will have 20 pylons and 16 piers to reach the highest point of 30m. It is part of the Sabah Al-Ahmad Corridor project, according to the Public Works Authority of Qatar (Ashgal). With four lanes in each direction, the bridge will accommodate more than 16,000 vehicles a hour, according to Ashghal engineer Abdullah al-Naiemi. Comnpletion is set for early 2021. Meahwhile, the Haloul Int
  • Alarming results from US distracted driving survey
    May 16, 2013
    Transurban-Fluor and AAA Mid-Atlantic have published an alarming report on distracted driving on the busy I-95 highway in Northern Virginia in the US. The two bodies have launched a regional campaign focused on reducing distracted driving in the 95 Express Lanes construction zone. According to the report, almost all (94%) of frequent I-95 drivers have seen someone engage in dangerous, distracted behaviour while driving on this busy commuter route. In addition, more than half (56%) of I-95 drivers use their
  • US$600 million for Cape Fear bridge replacement?
    February 14, 2024
    An estimate of up to US$600 million has been suggested for North Carolina’s Cape Fear bridge replacement.