Skip to main content

Major road widening project for Cambridgeshire

Work to upgrade the A14 route in Cambridgeshire now looks set to commence at the end of 2016. The A14 will be widened along a 33.6km stretch as part of a programme of works to increase its capacity. The work will also involve building a new bypass around Huntingdon as well as widening a section of the A1. The project also includes making a series of improvements to five junctions situated along the route, located at Bar Hill, Swavesey, Girton, Histon and Milton. In all the work is expected to cost some £1.5
May 12, 2016 Read time: 2 mins
Work to upgrade the A14 route in Cambridgeshire now looks set to commence at the end of 2016. The A14 will be widened along a 33.6km stretch as part of a programme of works to increase its capacity. The work will also involve building a new bypass around Huntingdon as well as widening a section of the A1. The project also includes making a series of improvements to five junctions situated along the route, located at Bar Hill, Swavesey, Girton, Histon and Milton. In all the work is expected to cost some £1.5 billion and this project is needed due to the high traffic volumes the A14 experiences. Congestion is commonplace along the route at present during peak periods and the road also has to contend with a high percentage of HGVs travelling to and from the nearby ports.

The widened stretch of the A14 is expected to be ready for traffic by 2020 and the structure of the roadway will ensure it is able to carry a high percentage of heavily loaded HGVs. The work will made more be complex due to the fact that it will be carried out alongside live traffic. And the construction team will have to ensure that the road building activities do not disrupt vehicle flow rates.

Related Content

  • New Polish motorway opens to traffic
    August 7, 2019
    A new section of Poland’s important A1 motorway project is now open to traffic. The 33km stretch connects Pyrzowice with Czestochowa in southern Poland. This forms part of a project to build a 58km section of the A1 route, with an expected cost of €696 million. Improving transport connections with Pyrzowice is important for southern Poland as the town is the location of the airport serving the nearby industrial city of Katowice, as well as Czestochowa. The A1 motorway connects the port of Gdansk in Poland’
  • Act FAST when it comes to bridge maintenance, argues Cliff Weston
    February 27, 2017
    Deck waterproofing remains critical to a bridge’s structural integrity for its design life, explains Cliff Weston, director of Stirling Lloyd To properly maintain deck waterproofing there must be a willingness to look at solutions based on whole-life costing rather than just short-term initial costs. There are lessons to be learned from examples of prematurely failed infrastructure due to a focus on initial short-term costs.
  • Bangladesh moves forward with US$735 million highways programme
    August 5, 2021
    A massive highways development programme is being planned in Bangladesh
  • Champlain Bridge set to open by end of year, says SNC-Lavalin
    May 14, 2018
    The Canadian city’s replacement Champlain Bridge will open on schedule at the end of the year. Montreal, one of Canada’s largest cities, will have a well-earned Christmas present in December when the new Champlain Bridge opens after 42 months of construction. The new bridge, part of a six-lane 6km corridor including roads, is being built alongside the original bridge over the Saint Lawrence River and Seaway canal system. The new bridge, 3.4km long, runs from the île des Soeurs to Brossard, immediately dow