Skip to main content

Major road widening project for Cambridgeshire

Work to upgrade the A14 route in Cambridgeshire now looks set to commence at the end of 2016. The A14 will be widened along a 33.6km stretch as part of a programme of works to increase its capacity. The work will also involve building a new bypass around Huntingdon as well as widening a section of the A1. The project also includes making a series of improvements to five junctions situated along the route, located at Bar Hill, Swavesey, Girton, Histon and Milton. In all the work is expected to cost some £1.5
May 12, 2016 Read time: 2 mins
Work to upgrade the A14 route in Cambridgeshire now looks set to commence at the end of 2016. The A14 will be widened along a 33.6km stretch as part of a programme of works to increase its capacity. The work will also involve building a new bypass around Huntingdon as well as widening a section of the A1. The project also includes making a series of improvements to five junctions situated along the route, located at Bar Hill, Swavesey, Girton, Histon and Milton. In all the work is expected to cost some £1.5 billion and this project is needed due to the high traffic volumes the A14 experiences. Congestion is commonplace along the route at present during peak periods and the road also has to contend with a high percentage of HGVs travelling to and from the nearby ports.

The widened stretch of the A14 is expected to be ready for traffic by 2020 and the structure of the roadway will ensure it is able to carry a high percentage of heavily loaded HGVs. The work will made more be complex due to the fact that it will be carried out alongside live traffic. And the construction team will have to ensure that the road building activities do not disrupt vehicle flow rates.

Related Content

  • Hamburg road tunnel refurbishment commences
    April 20, 2018
    The delayed work to refurbish one of the tubes for the Elbe Tunnel in Hamburg has now commenced. Work to refurbish the other tube is set to commence shortly. This upgrade is required to improve the tunnel link, which carries a very heavy volume of traffic passing along the A1 Autobahn. This stretch of highway is amongst the busiest in Europe and carries a high percentage of truck traffic. The delay was due to construction activity being carried out on the A1 Hamburg Südost and the Süderelbbrücke bridge.
  • Auckland’s future strategic transport requirements
    July 5, 2012
    The Auckland Harbour Bridge is at the stage that it cannot cope with much more traffic, yet the population of the Auckland region continues to grow at a steady rate. Coupled with that, the bridge is a key link in the most important transport corridor in the country, State Highway One. Without it, the country would struggle to function. Not only home to New Zealand's largest city and one third of its population, Auckland's port is one of the country's largest. Some 140m north of the city is Marsden Point, th
  • Major project to construct landmark Bay Bridge in California
    October 31, 2012
    Iconic California crossing will offer seismic safety – Adrian Greeman reports A unique single-span single-tower suspension bridge is the iconic centrepiece of a dramatic renewal of the eastern Bay Bridge in California, crossing from San Francisco to Oakland. Tourists in San Francisco sometimes mix up their bridges, identifying as the famous Golden Gate, the double suspension bridge which runs across the wide San Francisco Bay. These serially linked bridges in fact form the Bay Bridge east to Oakland whereas
  • Fast resurfacing work in UK by contractor Eurovia
    May 15, 2017
    In the UK the contractor Eurovia has recently carried out a challenging resurfacing job within a tight timescale. The firm had to contend with live traffic on a busy stretch of motorway, while carrying out the work close to shared intersections. The traffic was particularly heavy also during part of the job due to a holiday period and large numbers of tourist vehicles using the stretch of motorway.