Skip to main content

Major road widening project for Cambridgeshire

Work to upgrade the A14 route in Cambridgeshire now looks set to commence at the end of 2016. The A14 will be widened along a 33.6km stretch as part of a programme of works to increase its capacity. The work will also involve building a new bypass around Huntingdon as well as widening a section of the A1. The project also includes making a series of improvements to five junctions situated along the route, located at Bar Hill, Swavesey, Girton, Histon and Milton. In all the work is expected to cost some £1.5
May 12, 2016 Read time: 2 mins
Work to upgrade the A14 route in Cambridgeshire now looks set to commence at the end of 2016. The A14 will be widened along a 33.6km stretch as part of a programme of works to increase its capacity. The work will also involve building a new bypass around Huntingdon as well as widening a section of the A1. The project also includes making a series of improvements to five junctions situated along the route, located at Bar Hill, Swavesey, Girton, Histon and Milton. In all the work is expected to cost some £1.5 billion and this project is needed due to the high traffic volumes the A14 experiences. Congestion is commonplace along the route at present during peak periods and the road also has to contend with a high percentage of HGVs travelling to and from the nearby ports.

The widened stretch of the A14 is expected to be ready for traffic by 2020 and the structure of the roadway will ensure it is able to carry a high percentage of heavily loaded HGVs. The work will made more be complex due to the fact that it will be carried out alongside live traffic. And the construction team will have to ensure that the road building activities do not disrupt vehicle flow rates.

Related Content

  • Construction commencing for Moroccan city bypass project
    August 27, 2019
    A new road bypass project is being built for the Moroccan city of Berkane. Located in the west of the country, close to the Algerian border, the city of Berkane is bisected at present by the key N2 highway, which meets with the R612 trunk route. The new bypass will carry through traffic using these routes around the city instead, cutting congestion at peak periods and improving journey times for drivers. In addition the new bypass will also improve traffic safety and help with the development of Bekane. The
  • Onsite asphalt recycling
    December 15, 2020
    Equipment from Ammann has played a key role in renovating a section of the N2 highway in Switzerland
  • Cleveland Bridge UK’s A14 work shortlisted
    July 15, 2020
    The showpiece bridge for A14 project is the 750m-long viaduct over River Great Ouse.
  • Efficient road traffic management for large-scale sporting events
    October 25, 2022
    Modern road networks require a significant amount of infrastructure to function, from the roads themselves to signage, as well as other assets that are needed to keep things running. Throw in the digitisation of road networks and infrastructure requirements will significantly increase, especially when it comes to the introduction of connected (“internet-of-things”) devices and an array of sensor systems required for road monitoring.