Skip to main content

Major interchange project for Israel

The transport authorities in Israel have published the tender documents for a project to build the South Ra'anana Interchange.
March 2, 2012 Read time: 1 min
The transport authorities in Israel have published the tender documents for a project to build the South Ra'anana Interchange. The project is expected to cost US$250 million and will feature a three level interchange, with the design requiring the elevation of the new Road 531 above the existing Road 4. Below this interchange a 1.825km long tunnel will be bored to make way for rail tracks and the construction of a new station. The project will be implemented under a design build model, with the winning bidder planning and constructing the interchange to a set of predefined schedules.

Related Content

  • Israel tender deal
    February 24, 2012
    The Israel National Roads Company has awarded a tender to The Mordechai Binyamin for the construction of the Golani interchange.
  • Israel project -tenders opening
    February 29, 2012
    Tenders are being called for the new Road 9 construction project in Israel.
  • Mostotrest won another tender for building of Moscow-St Petersburg highway
    February 20, 2014
    The award for a key stretch of the Moscow-St Petersburg highway has been awarded - Eugene Gerden writes As expected by analysts, Mostotrest, owned by the Rotenberg brothers, won the tender for the construction of the sixth and longest section of the Moscow-St Petersburg highway. Under the conditions of the tender the company will build 209km of the highway (334-543km), which will pass through the Tver and Novgorod regions of Russia. The cost of construction is 144.6 billion Rubles (US$4.51 billion), 16 bill
  • Brisbane’s new airport link is an engineering success
    April 12, 2013
    Financial troubles for Brisbane's new Airport Link overshadow its construction success – Adrian Greeman writes. Political argument and legal dispute is likely to rage for some time yet over the bankruptcy of Australian road operator BrisConnect, which went into receivership this February with A$3 billion in debt. Toll paying users for its new Airport Link have been less than half the predicted numbers since it opened in July last summer. But if its nancial engineering is being questioned, the same is not t