Skip to main content

Major Chinese highway project commencing

In China work is commencing on the Mulei-Wutongdaquan highway. The work will be carried out in China’s Xinjiang Uygur autonomous region and is costing close to US$2.6 billion. The highway will feature four lanes, with two in either direction and will measure 515km long. The project will form the last section of the Beijing-Urumqi Expressway to be completed.
April 26, 2017 Read time: 1 min
In China work is commencing on the Mulei-Wutongdaquan highway. The work will be carried out in China’s Xinjiang Uygur autonomous region and is costing close to US$2.6 billion. The highway will feature four lanes, with two in either direction and will measure 515km long. The project will form the last section of the Beijing-Urumqi Expressway to be completed.

Related Content

  • Strong interest for major highway concessions in Colombia
    June 6, 2013
    Interest is said to be strong for the Pacífico 1, Pacífico 2 and Pacífico 3 highway concession projects in Colombia. At present the country’s national infrastructure agency, ANI, has 56 expressions of interest for the three highway concessions in Antioquia Department. The projects feature a total estimated investment of US$2.16 billion.
  • India highway widening work for key link
    October 22, 2018
    A highway widening project will be carried out on the route connecting Mumbai with Vadodara in India. A 23.4km stretch of the highway will be widened so that it features four lanes in either direction. A finance package worth US$ 132.5 million has been secured to help carry out the project and the work will be handled by IRB Infrastructure Developers (IRB Infra). In addition the National Highway Authority of India will also contribute to the project.
  • India highway widening work for key link
    October 22, 2018
    A highway widening project will be carried out on the route connecting Mumbai with Vadodara in India. A 23.4km stretch of the highway will be widened so that it features four lanes in either direction. A finance package worth US$ 132.5 million has been secured to help carry out the project and the work will be handled by IRB Infrastructure Developers (IRB Infra). In addition the National Highway Authority of India will also contribute to the project.
  • Chinese highway work
    January 18, 2021
    Key Chinese highway work is being planned.