Skip to main content

Major Brazilian bridge project revised

A major Brazilian bridge project has been revised.
By MJ Woof December 9, 2020 Read time: 1 min
A major bridge project in Brazil is now being redesigned, although this will push up costs – image courtesy of © Pbardocz, Dreamstime.com
Major revisions have been made for a key Brazilian bridge project. The bridge connecting Santos with Guarauja will now feature increased spacings between the supports. This redesign will allow an improved passage for shipping.

The distance between the central support pillars for the structure will be 750m-apart, instead of the 400m originally planned. This is a key amendment given the importance of the port area nearby.

The bridge is now expected to cost close to US$725 million to build however, instead of the $557.6 million originally expected. The construction phase should take three years.

Related Content

  • Stonehenge tunnel plans revised
    February 8, 2018
    Plans for the £1.6 billion Stonehenge Tunnel bypass in the UK have now been revised.
  • New Tisza River bypass bridge to be built at Szolnok, Hungary
    June 28, 2019
    Hungary will soon tender for a new bypass bridge over the Tisza River near Szolnok at a cost of around €77 million. Laszlo Mosoczi, state secretary of the Ministry of Innovation and Technology, said a tender for the planning works is to be called in the autumn with a winner announced in early 2020. The entire project could take five or six years. Szolnok, a town of 72,000 in the Great Hungarian Central Plain 100km east-southeast of the capital Budapest, already has a continuous beam St. Stephen's Brid
  • Korean bridge construction poses challenges
    February 23, 2012
    On South Korea's southern coast, an innovative highway sea crossing is providing many engineering challenges
  • Korean bridge construction poses challenges
    April 5, 2012
    On South Korea's southern coast, an innovative highway sea crossing is providing many engineering challenges The new Busan-Geoje crosses from South Korea's second city to its biggest island and is slightly shorter than the 12km of the country's famous Incheon project. In addition the main cable stay bridge for the Busan-Geoje project has a 475m span rather than the 800m of the Incheon central span. However the 8.2km Busan-Geoje project faces perhaps greater technical challenges and also includes a second b