Skip to main content

Major Brazilian bridge project revised

A major Brazilian bridge project has been revised.
By MJ Woof December 9, 2020 Read time: 1 min
A major bridge project in Brazil is now being redesigned, although this will push up costs – image courtesy of © Pbardocz, Dreamstime.com
Major revisions have been made for a key Brazilian bridge project. The bridge connecting Santos with Guarauja will now feature increased spacings between the supports. This redesign will allow an improved passage for shipping.

The distance between the central support pillars for the structure will be 750m-apart, instead of the 400m originally planned. This is a key amendment given the importance of the port area nearby.

The bridge is now expected to cost close to US$725 million to build however, instead of the $557.6 million originally expected. The construction phase should take three years.

Related Content

  • Ho Chi Minh City pushes ahead with Thu Thiêm Bridge 4 project
    April 18, 2017
    Authorities in Vietnam’s southern Ho Chi Minh City are seeking prime ministerial approval for the nearly 2.2km-long Thu Thiêm Bridge 4 project. The six-lane bridge will cost more than US$230 million and be a build-transfer contract, according to a report in the Vietnam Investment Review. In September, Ho Chi Minh’s City’s People’s Committee said it is considering three investors for the work - Phát Đạt Corporation Real Estate Development, Investment Corporation 620 and 168 Construction Development Investmen
  • Moscow-Kazan highway plans
    June 17, 2020
    The Moscow-Kazan highway plans form part of the nation’s future economic recovery.
  • Lázár defends Mohács Danube bridge
    January 21, 2025
    A public tender was won last year by Duna Aszfalt and the design for the controversial 750m-long three-arch structure in Hungary has been done by Hungarian civil engineering firm SpecialTerv.
  • Vietnam’s key expressway project
    April 1, 2020
    Vietnam’s key expressway project sees revised plan