Skip to main content

Major Brazilian bridge project revised

A major Brazilian bridge project has been revised.
By MJ Woof December 9, 2020 Read time: 1 min
A major bridge project in Brazil is now being redesigned, although this will push up costs – image courtesy of © Pbardocz, Dreamstime.com
Major revisions have been made for a key Brazilian bridge project. The bridge connecting Santos with Guarauja will now feature increased spacings between the supports. This redesign will allow an improved passage for shipping.

The distance between the central support pillars for the structure will be 750m-apart, instead of the 400m originally planned. This is a key amendment given the importance of the port area nearby.

The bridge is now expected to cost close to US$725 million to build however, instead of the $557.6 million originally expected. The construction phase should take three years.

Related Content

  • Formwork solutions for bridge maintenance and repair
    January 6, 2015
    An array of innovative formwork solutions have helped in the repair and construction of key bridge links - Mike Woof writes Formwork producers are continually developing novel solutions for bridge maintenance and construction applications. Several key structures have benefited from the novel use of formwork systems, with suppliers such as Doka, PERI, Pilosio and RMD all working on important structures in recent times. In Estonia, construction work is underway on the bypass around Tartu, the country’s
  • Finnish causeway project tendering
    October 20, 2021
    The tender process is open for a major Finnish causeway project.
  • Svevia in Fjälkinge and Gualöv motorway deal
    April 7, 2023
    Under the contract in southern Sweden - worth around €45 million - the state-owned civil engineering company will also construct six bridges of which two will be fauna passages.
  • New Midtown Tunnel open in Virginia
    January 30, 2017
    A project to construct the second Midtown Tunnel link in the US state of Virginia alongside the original connection has taken an important step forward – Mike Woof writes Commuters in the US state of Virginia will be pleased that the new Midtown Tunnel is now open to traffic, as it will help to boost capacity and cut congestion on the busy US 58 route connecting Norfolk and Portsmouth. The 1.13km tunnel link has been built to link with the interchange at Brambleton Avenue and Hampton Boulevard in Norfolk