Skip to main content

Louis Berger wins key India bridge deal

Louis Berger has been awarded the management contract for the Versova-Bandra Sea Link project in India. The US$17 million project management services deal was awarded to the firm by the Maharashtra State Road Development Corporation (MSRDC). The construction of the Versova-Bandra Sea Link (VBSL) is estimated to cost some $1 billion and will take 54 months to complete. “We are honored to play a major role in one of the largest infrastructure projects — not just in Mumbai, but in India,” said Kshitish
January 10, 2018 Read time: 2 mins
The new VBSL link in India will speed transport in Maharashtra State

8657 Louis Berger has been awarded the management contract for the Versova-Bandra Sea Link project in India. The US$17 million project management services deal was awarded to the firm by the Maharashtra State Road Development Corporation (MSRDC). The construction of the Versova-Bandra Sea Link (VBSL) is estimated to cost some $1 billion and will take 54 months to complete.

“We are honored to play a major role in one of the largest infrastructure projects — not just in Mumbai, but in India,” said Kshitish Nadgauda, Louis Berger senior vice president and managing director for Asia. “Our responsibilities on this significant project will require efficient delivery of top-quality, highly responsive services, and our intent is to exceed the MSRDC’s expectations in every respect.”

The VBSL, a northward extension of the existing Bandra-Worli Sea Link running along the western coast of the island of Mumbai, will be an eight-lane highway, approximately 10km in length. It will connect the western suburbs of Versova and Bandra. The main sea link will include a cable-stayed bridge section and a balanced-cantilever section for navigational purposes. It will also include two intermediate connectors, which will connect the sea link to the mainland and serve areas between Versova and Bandra, including Juhu and Koliwada. The sea link will help reduce traffic congestion in Mumbai.

 Louis Berger will provide services in three phases. The first phase will include the peer review of the previously-compiled techno-economic feasibility study and detailed project report (DPR). The second phase will include compilation of tender documents for engineering, procurement and construction (EPC) of the project, as well as management of the bid process. The third and last phase will involve project and construction management services during the construction and defects liability periods, including review of the selected EPC contractor’s engineering designs. The project is slated for completion by late 2021.

“We’re immensely proud to be selected for one of the largest sea link projects and look forward to working closely with the Maharashtra State Road Development Corporation throughout the duration of the project to ensure successful delivery on schedule and within budget,” said Amol Rodrigues, Louis Berger’s business development director for South Asia.

For more information on companies in this article

Related Content

  • Louis Berger lands safety audit role in four Bihar, India highway build projects
    February 18, 2014
    The National Highways Authority of India (NHAI) has selected Louis Berger (LB) to serve as safety audit consultant for four national highway construction projects in the eastern state of Bihar. A globally-recognised provider of engineering, development and management support services for public and private clients, LB will perform safety audits during the three-year construction and widening of 366kms of roadway on four national highways. The project team, led by road safety expert Brindabon Samanta, will
  • Atkins wins Texas Department of Transportation contract
    June 18, 2018
    Atkins, a member of the SNC-Lavalin Group, has been awarded a statewide procurement engineering contract from the Texas Department of Transportation (TxDOT). The deal will see Atkins assisting TxDOT with alternative delivery procurement needs throughout the state. “Our role is to review and analyse the approaches outlined in submittals from design-builders or others to ensure they can commit to and meet TxDOT’s alternative delivery expectations,” said Wes Burford, senior project director in SNC-Lavalin’s
  • US$5 billion Indian road project
    December 16, 2024
    A US$5 billion road project is underway in Pune, India.
  • India’s new expressway under construction
    July 19, 2022
    India’s longest new expressway is under construction.