Skip to main content

Leighton scores hat-trick of Hong Kong Central – Wan Chai Bypass tunnel jobs

Leighton Asia, India and Offshore has secured a contract worth US$408.14 million to construct the tunnel buildings, systems and fitting out works associated with the Central - Wanchai Bypass (CWB) tunnel in Hong Kong. This is the third project to be awarded to Leighton on the Central - Wanchai Bypass (CWB) project by the HKSAR's Highways Department, following the award of the 2010 contract for the construction of the Central Interchange and the Central Reclamation Phase III in 2009.
February 21, 2014 Read time: 2 mins
Leighton Asia, India and Offshore has secured a contract worth US$408.14 million to construct the tunnel buildings, systems and fitting out works associated with the Central - Wanchai Bypass (CWB) tunnel in Hong Kong.

This is the third project to be awarded to Leighton on the Central - Wanchai Bypass (CWB) project by the HKSAR's Highways Department, following the award of the 2010 contract for the construction of the Central Interchange and the Central Reclamation Phase III in 2009.

Leighton is to install extensive specialist electrical and mechanical (E&M) works, including route-wide tunnel E&M works, traffic control and surveillance systems, road tunnel wall cladding works, the tunnel roof thermal barrier and the tunnel road pavement construction for the complete tunnel from Central to North Point. It also includes the construction and fit out of ventilation buildings and an administration building.

Due to open in 2017, the CWB will be a 4km trunk road running between Central and Causeway Bay in Hong Kong Island. The CWB’s 2.3km dual three-lane tunnel, being worked on by Leighton Asia, India and Offshore, will run under new reclamation areas which will be provided by Central and Wan Chai Reclamation project, and also connections to Connaught Road West flyover and Island Eastern Corridor. When completed, the CWB will substitute Connaught Road Central, Harcourt Road and Gloucester Road to be part of Route 4.

Related Content

  • New road project for Hong Kong
    October 31, 2018
    A new road project worth US$440 million is going ahead in Hong Kong’s Yau Ma Tei west area. The project is for a six-lane road and the new link will be constructed by a consortium comprising SK Engineering & Construction Co (SK E&C) and local firm Build King Construction. Work is now starting and the package of works is expected to take 84 months to complete. The contract was awarded to the consortium by Hong Kong’s Highways Department.
  • Tunnels - an environmentally attractive option?
    February 21, 2012
    While tunnels are often more expensive than bridges, they can offer environmentally attractive options for transport schemes. Tunnels offer environmentally attractive options for a range of transport infrastructure schemes, but in many cases high construction costs may restrict their use.
  • Expectations for growth of UAE infrastucture
    February 9, 2012
    The INTERMAT Middle East event is being launched at a pivotal time of major infrastructure development in the region. As with most sectors, the highways industry has not had a fantastic 18 months in the Gulf. Not only has the recession impacted the delivery of projects across the board, GCC Governments' attention have been switching increasingly to rail, as plans to roll out a Gulf-wide rail system gather steam. GCC countries will invest over US$119.6 billion in infrastructure projects over the next decade
  • Tuen Mun to Chek Lap Kok tunnel connection
    January 24, 2017
    It is not only the scale of the Tuen Mun to Chek Lap Kok tunnel that impressed delegates but the number of novel technologies that Dragages Hong Kong, a Bouygues Construction subsidiary, is employing on this project The 4.6 km tunnel running 60m below sea level is part of a strategic new route linking Hong Kong’s airport on Lantau Island and the New Territories.