Skip to main content

Leighton scores hat-trick of Hong Kong Central – Wan Chai Bypass tunnel jobs

Leighton Asia, India and Offshore has secured a contract worth US$408.14 million to construct the tunnel buildings, systems and fitting out works associated with the Central - Wanchai Bypass (CWB) tunnel in Hong Kong. This is the third project to be awarded to Leighton on the Central - Wanchai Bypass (CWB) project by the HKSAR's Highways Department, following the award of the 2010 contract for the construction of the Central Interchange and the Central Reclamation Phase III in 2009.
February 21, 2014 Read time: 2 mins
Leighton Asia, India and Offshore has secured a contract worth US$408.14 million to construct the tunnel buildings, systems and fitting out works associated with the Central - Wanchai Bypass (CWB) tunnel in Hong Kong.

This is the third project to be awarded to Leighton on the Central - Wanchai Bypass (CWB) project by the HKSAR's Highways Department, following the award of the 2010 contract for the construction of the Central Interchange and the Central Reclamation Phase III in 2009.

Leighton is to install extensive specialist electrical and mechanical (E&M) works, including route-wide tunnel E&M works, traffic control and surveillance systems, road tunnel wall cladding works, the tunnel roof thermal barrier and the tunnel road pavement construction for the complete tunnel from Central to North Point. It also includes the construction and fit out of ventilation buildings and an administration building.

Due to open in 2017, the CWB will be a 4km trunk road running between Central and Causeway Bay in Hong Kong Island. The CWB’s 2.3km dual three-lane tunnel, being worked on by Leighton Asia, India and Offshore, will run under new reclamation areas which will be provided by Central and Wan Chai Reclamation project, and also connections to Connaught Road West flyover and Island Eastern Corridor. When completed, the CWB will substitute Connaught Road Central, Harcourt Road and Gloucester Road to be part of Route 4.

Related Content

  • Positive finding for tunnel solution in Malta
    May 2, 2012
    A preliminary study on the proposed tunnel connecting the islands of Malta and Gozo has been carried out by Mott Macdonald. Mott Macdonald’s preliminary analysis of the Malta-Gozo undersea road link suggests that it would take 5-7 years to build a tunnel between the two islands. This report suggests a cost of €156-€492 million for a single bore three-lane tunnel on the shortest practical alignment route. Potentially, the project could be co-financed by the EU under the Cohesion Fund if a road tunnel link be
  • Vinci picks up Lafonataine Tunnel work
    August 12, 2020
    The renovated tunnel is expected to have about 40 years of life.
  • State of the art tunnel a conservation triumph
    May 2, 2012
    The opening of a 1.8km tunnel in southern England is designed to ease traffic bottlenecks in an environmentally sensitive area. Patrick Smith reports
  • State of the art tunnel a conservation triumph
    February 28, 2012
    The opening of a 1.8km tunnel in southern England is designed to ease traffic bottlenecks in an environmentally sensitive area. Patrick Smith reports