Skip to main content

Leighton scores hat-trick of Hong Kong Central – Wan Chai Bypass tunnel jobs

Leighton Asia, India and Offshore has secured a contract worth US$408.14 million to construct the tunnel buildings, systems and fitting out works associated with the Central - Wanchai Bypass (CWB) tunnel in Hong Kong. This is the third project to be awarded to Leighton on the Central - Wanchai Bypass (CWB) project by the HKSAR's Highways Department, following the award of the 2010 contract for the construction of the Central Interchange and the Central Reclamation Phase III in 2009.
February 21, 2014 Read time: 2 mins
Leighton Asia, India and Offshore has secured a contract worth US$408.14 million to construct the tunnel buildings, systems and fitting out works associated with the Central - Wanchai Bypass (CWB) tunnel in Hong Kong.

This is the third project to be awarded to Leighton on the Central - Wanchai Bypass (CWB) project by the HKSAR's Highways Department, following the award of the 2010 contract for the construction of the Central Interchange and the Central Reclamation Phase III in 2009.

Leighton is to install extensive specialist electrical and mechanical (E&M) works, including route-wide tunnel E&M works, traffic control and surveillance systems, road tunnel wall cladding works, the tunnel roof thermal barrier and the tunnel road pavement construction for the complete tunnel from Central to North Point. It also includes the construction and fit out of ventilation buildings and an administration building.

Due to open in 2017, the CWB will be a 4km trunk road running between Central and Causeway Bay in Hong Kong Island. The CWB’s 2.3km dual three-lane tunnel, being worked on by Leighton Asia, India and Offshore, will run under new reclamation areas which will be provided by Central and Wan Chai Reclamation project, and also connections to Connaught Road West flyover and Island Eastern Corridor. When completed, the CWB will substitute Connaught Road Central, Harcourt Road and Gloucester Road to be part of Route 4.

Related Content

  • Ulma in Poland’s S7 tunnel
    October 22, 2020
    Construction of Poland’s longest road tunnel is progressing with an MK Formwork Carriage system from Spanish manufacturer Ulma.
  • Skanska scores Polish project
    March 2, 2012
    Skanska is now starting work on a new highway to the northeast of the Polish city of Wroclaw. The project is worth €106 million and is for a 25km section of the S-8 highway running from Olesnica to Sycow
  • Tunnels eliminate bottlenecks
    February 10, 2012
    Some of the bottlenecks on the multi-lane Mittlere Ring, Munich, Germany, one of the main arterial roads circling the city centre have been eliminated by the addition of new tunnels. The Luise-Kiesselbach Square, the last section of this road improvement effort, is an important traffic hub south-west of the city where motorways A96 from Lindau and A5 from Garmisch meet, causing long delays in daily rush-hour traffic, writes Patrick Smith.
  • Presidio Parkway: the Golden Gate Bridge’s new southern approach road
    May 29, 2013
    Work on the Presidio Parkway, a new breathtaking and eco-friendly southern approach road to San Francisco’s Golden Gate Bridge, has entered its crucial second and final phase. As Guy Woodford reports, the vital US$1 billion project has overcome legal as well as environmental challenges to stay on course for its expected 2016 completion Just after 9pm on Friday April 27, 2012 a large public crowd looked on excitedly as a fleet of more than 40 R&L Brosamer and Ferma Corporation deployed hydraulic demolition h