Skip to main content

Leaks hit Czech Blanka Tunnel and boost costs

Further problems have hit the Blanka Tunnel in Czech capital Prague. The link has been hit by a series of delays and is now suffering from leaks. The project is costing €1.43 billion and is due to open in May 2014. The company building the tunnel Metrostav, has stated that the leaks are likely to be temporary and should be dealt with by the time the link opens to traffic, when it will become part of the Prague ring road. Construction work started on the tunnel in 2007 but the project has faced a series of p
July 26, 2013 Read time: 2 mins
Further problems have hit the Blanka Tunnel in Czech capital Prague. The link has been hit by a series of delays and is now suffering from leaks. The project is costing €1.43 billion and is due to open in May 2014. The company building the tunnel Metrostav, has stated that the leaks are likely to be temporary and should be dealt with by the time the link opens to traffic, when it will become part of the Prague ring road. Construction work started on the tunnel in 2007 but the project has faced a series of problems, including three collapses. The original cost was estimated at around €1.025 billion, including €870 million for the construction work. However, due to the problems the link has suffered the project is expected to cost in the order of €1.42 billion. The cost of the project spiralled following the delays and was expected to hit €1.5 billion, causing some controversy, however the city authorities managed to peg the final cost at €1.42 billion.

Related Content

  • Stonehenge tunnel contract
    July 24, 2019
    A contractor is now being sought for the UK’s Stonehenge Tunnel project. The work involves building a new tunnel and new stretch of dual carriageway, moving the busy A303 route away from the Stonehenge monument.
  • Cost expectations increase for Stockholm Bypass project
    February 6, 2024
    The cost for Stockholm Bypass project could be up to €4.7 billion.
  • Krasnodar central city connection
    November 2, 2018
    A new highway link is being planned for the Russian city of Krasnodar, which is expected to be ready for traffic in six years. The route will stretch 36km and connect the Kuban Stadium in the centre of the city with the M4 highway running around the outskirts. The project is expected to cost around US$340 million to construct. However, the route has still to be fully determined and the local authorities are opening tendering for the $1.42 million contract to handle the design and survey work. This new highw
  • Cost increases for major Chilean highway project
    November 15, 2013
    The cost of Chile’s Vespucio Oriente highway project is increasing, while its completion also looks set to be delayed. A 13% budget increase is now required due to additional costs from a number of factors such as urban landscaping, according to Business News Americas. The Américo Vespucio Oriente (AVO) expressway is being built in Chilean capital Santiago and was originally expected to cost in the region of US$940 million. However Chile’s Public Works Ministry, MOP, has said that the route will now cost so