Skip to main content

Lane Construction to carry out Florida highway deal

Lane Construction Corporation will carry out construction work worth US$134.6 million on a stretch of highway in Florida. This 21km section of the new Suncoast Parkway 2 will run to the north of Tampa, along Florida’s western coast. The route is intended to be a major transport corridor for the state and will feature four lanes. Called SR 589, the tolled route will run from South of SR 700 (US 98) to SR 44 in Hernando and Citrus Counties. Lane Construction is building the second of two sections of the Sunco
November 24, 2017 Read time: 2 mins
2878 Lane Construction Corporation will carry out construction work worth US$134.6 million on a stretch of highway in Florida. This 21km section of the new Suncoast Parkway 2 will run to the north of Tampa, along Florida’s western coast. The route is intended to be a major transport corridor for the state and will feature four lanes. Called SR 589, the tolled route will run from South of SR 700 (US 98) to SR 44 in Hernando and Citrus Counties. Lane Construction is building the second of two sections of the Suncoast Parkway 2, with the firm’s work due to commence in early 2018 and expected to require around 48 months to complete.


Lane Construction is the US subsidiary of Salini Impregilo and its work on the Florida highway project involves building 15 bridges. The work also includes milling and resurfacing, base work, drainage improvements and kerb and gutter construction. Finally Lane will install traffic signals, lighting and signing, as well as new safety guardrail, retaining walls, pedestrian walkways and a multi-use trail. Once the Suncoast Parkway 2 is opent to traffic, drivers can expect shorter commuting times while the new route will also improve sustainability by contributing to the reduction of emissions on the existing network between Citrus County and the Tampa Bay Region.

For more information on companies in this article

Related Content

  • Challenging Colombian tunnel completed
    May 30, 2024
    A tunnel stretch on Colombia’s Santa Fe - Cañasgordas highway is complete – Mauro Nogarin reports
  • Texas highway contract
    January 22, 2018
    Michael Baker International has been awarded a US$6.1 million contract by the Texas Department of Transportation (TxDOT). The contract is for Construction Engineering and Inspection (CEI) services for the Lowest Stemmons Freeway project. The Lowest Stemmons project, a 3.7km stretch of Interstate-35E (I-35E), runs from Interstate-30 to north of Oak Lawn Avenue in Dallas. The aim of the project is to reduce congestion, improve mobility and deliver more reliable travel times. The project is also the first for
  • Mongolia road development project going ahead
    March 14, 2019
    A major road development project for Mongolia will be carried out on the AH-3 route.
  • Massey Tunnel project to be Design-Build-Finance-Operate-Maintain
    January 25, 2016
    The provincial British Columbia government in western Canada has chosen a Design-Build-Finance-Operate-Maintain (DBFOM) procurement model for the Vancouver region’s 10-lane bridge replacement for the ageing Massey Tunnel. The US$2.5 billion project includes a bridge and related Highway 99 improvements between Bridgeport Road in the adjacent city of Richmond and Highway 91 in the city of Delta. The 60-year-old tunnel now carries its limit of 80,000 vehicles a day and is often congested during rush hours.